Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12816
Well Classification: GW Status: PR - 9/10/2012
Well Name/No:FEDERAL #RWF 23-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date9/10/2012
FacilityID:286870LocationID:335743
County:GARFIELD #045Location:NESE 8 6S94W 6
Field:RULISON - #75400Elevation:5940 ft.
Basin:PICEANCE BASIN  
Planned Location:1810FSL  507 FELLat/Long: 39.537434 / -107.904500Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.537437 / -107.904504Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/10/2012             Measured TD: 9560 ft.    Vertical TD: 788 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/10/2012
Wellbore PermitDIRECTIONAL
Permit #:20081689 Expiration Date:5/4/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2005 FSL  715 FWL
Bottom Hole Location:Sec:8 Twp: 6S 94W Footage: 2005 FSL  715 FWL
Proposed Depth/Form:9486 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:N/A
Spud Date:5/3/2008Spud Date Is:ACTUAL
Measured TD:9560 ft.Measured PB depth:9498 ft.
True Vertical TD:788 ft.True Vertical PB depth:8726 ft.
Top PZ Location:Sec:8 Twp: 6s 94wFootage: 2451 FSL  1863 FWL
Bottom Hole Location:Sec:8 Twp: 6S 94WFootage: 2437 FSL  1836 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3133 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 875, Top: 0 ft., Bottom: 3133 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9545 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1275, Top: 4620 ft., Bottom: 9545 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 7138 ft., Depth: , Bottom: 7282 ft., Sacks: 50, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WASATCH G2549 ft.
MESAVERDE5786 ft.
CAMEO8591 ft.
ROLLINS9449 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/10/2012                 Interval Top: 7138 ft.    Interval Bottom: 9294 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/7/2008
Treatment Summary:3000 GAL 7 1/2% HCL; 691,600 # 20/40 SAND; 21,006 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:9011 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_GOR 0
CASING_PRESS 1676
MCF_GAS 1259
TUBING_PRESS 1260
Perforation Data:
Interval Top:7138 ft.# Of Holes:118
Interval Bottom:9294 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)66
Total Gas Produced (MCF)17390
GOR263484
GOR DeterminationMCFE
Average BOE per Day8.399
Average MCFE per Day48.706

 Federal Financial Assurance  i Y

 Tribal Well  i No