Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12775
Well Classification: GW Status: PR - 2/9/2017
Well Name/No:DIAMOND ELD #RWF 414-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/9/2017
FacilityID:286779LocationID:334720
County:GARFIELD #045Location:NWSW 4 7S94W 6
Field:RULISON - #75400Elevation:6264 ft.
Basin:PICEANCE BASIN  
Planned Location:1527FSL  369 FWLLat/Long: 39.464076 / -107.900807Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.464074 / -107.900803Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/9/2017             Measured TD: 8544 ft.    Vertical TD: 8387 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/9/2017
Wellbore PermitDIRECTIONAL
Permit #:20063786 Expiration Date:9/14/2007
Proposed Top PZ Location:Sec:4 Twp: 7S 94W Footage: 241 FSL  440 FWL
Bottom Hole Location:Sec:4 Twp: 7S 94W Footage: 241 FSL  440 FWL
Proposed Depth/Form:8561 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:4/17/2007
Spud Date:3/28/2007Spud Date Is:ACTUAL
Measured TD:8544 ft.Measured PB depth:8484 ft.
True Vertical TD:8387 ft.True Vertical PB depth:8327 ft.
Top PZ Location:Sec:4 Twp: 7S 94WFootage: 241 FSL  440 FWL
Bottom Hole Location:Sec:4 Twp: 7S 94WFootage: 247 FSL  423 FWL
Log Types:CBL; PLATFORM EXP, ARRAY INDUCTION TOOL, GR/SP
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 114 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2918 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 757, Top: 0 ft., Bottom: 2918 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8530 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 980, Top: 3820 ft., Bottom: 8530 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2689 ft.
OHIO CREEK5000 ft.
MESAVERDE5091 ft.
WILLIAMS FORK6508 ft.
CAMEO7599 ft.
ROLLINS8564 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/9/2017                  Interval Top: 6530 ft.    Interval Bottom: 8353 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/12/2007Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/11/2007
Treatment Summary:3250 GALS 7 1/2% HCL, 602,700# 20/40 SAND, 17,295 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1759
MCF_GAS 1461
TUBING_PRESS 1596
Perforation Data:
Interval Top:6530 ft.# Of Holes:118
Interval Bottom:8353 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)11045
GOR920416
GOR DeterminationMCFE
Average BOE per Day5.250
Average MCFE per Day30.460

 Federal Financial Assurance  i 

 Tribal Well  i No