Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12721
Well Classification: GW Status: PR - 9/15/2006
Well Name/No:WILLIAMS #RWF 311-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/15/2006
FacilityID:286771LocationID:335141
County:GARFIELD #045Location:NWNW 29 6S94W 6
Field:RULISON - #75400Elevation:5261 ft.
Basin:PICEANCE BASIN  
Planned Location:797FNL  842 FWLLat/Long: 39.501154 / -107.918172Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.501153 / -107.918173Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/13/2006             Measured TD: 7790 ft.    Vertical TD: 7772 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/13/2006
Wellbore PermitDIRECTIONAL
Permit #:20063517 Expiration Date:9/13/2007
Proposed Top PZ Location:Sec: Twp: Footage: 769 FNL  453 FWL
Bottom Hole Location:Sec:29 Twp: 6S 94W Footage: 769 FNL  453 FWL
Proposed Depth/Form:7773 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:3/22/2007
Spud Date:3/9/2007Spud Date Is:ACTUAL
Measured TD:7790 ft.Measured PB depth:7768 ft.
True Vertical TD:7772 ft.True Vertical PB depth:
Top PZ Location:Sec:29 Twp: 6S 94WFootage: 767 FNL  456 FWL
Bottom Hole Location:Sec:29 Twp: 6S 94WFootage: 767 FNL  456 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1147 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1147 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7785 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1055, Top: 3850 ft., Bottom: 7785 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1804 ft.NN
MESAVERDE4154 ft.NN
CAMEO6800 ft.NN
ROLLINS7707 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/12/2007                 Interval Top: 5340 ft.    Interval Bottom: 7645 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/2/2007Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/1/2007
Treatment Summary:3000 GALS 7 1/2% HCL; 740,200# 20/40 SAND; 19582 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7142 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/12/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1965
MCF_GAS 1330
TUBING_PRESS 1911
Perforation Data:
Interval Top:5340 ft.# Of Holes:119
Interval Bottom:7645 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)16721
GOR597178
GOR DeterminationMCFE
Average BOE per Day7.972
Average MCFE per Day46.269

 Federal Financial Assurance  i Y

 Tribal Well  i No