Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12602
Well Classification: GW Status: PR - 4/27/2007
Well Name/No:FEDERAL #PA 534-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62162
Facility Status:PRStatus Date4/27/2007
FacilityID:286023LocationID:335421
County:GARFIELD #045Location:SWSE 29 6S95W 6
Field:PARACHUTE - #67350Elevation:5576 ft.
Basin:PICEANCE BASIN  
Planned Location:265FSL  2334 FELLat/Long: 39.489004 / -108.020875Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.489003 / -108.020880Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/27/2007             Measured TD: 7390 ft.    Vertical TD: 7386 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/27/2007
Wellbore PermitDIRECTIONAL
Permit #:20072322 Expiration Date:5/23/2008
Proposed Top PZ Location:Sec: Twp: Footage: 147 FSL  2398 FEL
Bottom Hole Location:Sec:29 Twp: 6S 95W Footage: 147 FSL  2398 FEL
Proposed Depth/Form:7404 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/24/2007
Spud Date:9/13/2007Spud Date Is:ACTUAL
Measured TD:7390 ft.Measured PB depth:7316 ft.
True Vertical TD:7386 ft.True Vertical PB depth:7312 ft.
Top PZ Location:Sec:29 Twp: 6S 95WFootage: 157 FSL  2414 FEL
Bottom Hole Location:Sec:29 Twp: 6S 95WFootage: 157 FSL  2414 FEL
Log Types:CBL, RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2039 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 2039 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7380 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1022, Top: 2950 ft., Bottom: 7380 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1806 ft.NN
MESAVERDE3890 ft.NN
CAMEO6524 ft.NN
ROLLINS7307 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/31/2008                 Interval Top: 5177 ft.    Interval Bottom: 7207 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/20/2007Choke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/12/2007
Treatment Summary:3000 GALS 7.5% HCL; 769,300# 20/40 SAND; 17,236 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6809 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1070
CASING_PRESS 1080
MCF_GAS 939
TUBING_PRESS 919
Perforation Data:
Interval Top:5177 ft.# Of Holes:122
Interval Bottom:7207 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)16148
GOR598074
GOR DeterminationMCFE
Average BOE per Day7.708
Average MCFE per Day44.680

 Federal Financial Assurance  i Y

 Tribal Well  i No