Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12599
Well Classification: GW Status: PR - 12/13/2007
Well Name/No:PA #31-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/13/2007
FacilityID:285999LocationID:334700
County:GARFIELD #045Location:SWSE 32 6S95W 6
Field:PARACHUTE - #67350Elevation:5140 ft.
Basin:PICEANCE BASIN  
Planned Location:804FSL  2076 FELLat/Long: 39.476050 / -108.019680Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476058 / -108.019689Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/13/2007             Measured TD: 6640 ft.    Vertical TD: 6485 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/13/2007
Wellbore PermitDIRECTIONAL
Permit #:20062742 Expiration Date:8/1/2007
Proposed Top PZ Location:Sec: Twp: Footage: 226 FNL  2268 FEL
Bottom Hole Location:Sec:5 Twp: 7S 95W Footage: 226 FNL  2268 FEL
Proposed Depth/Form:6683 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:2/5/2007
Spud Date:1/25/2007Spud Date Is:ACTUAL
Measured TD:6640 ft.Measured PB depth:6596 ft.
True Vertical TD:6485 ft.True Vertical PB depth:
Top PZ Location:Sec:5 Twp: 7S 95WFootage: 197 FNL  2485 FEL
Bottom Hole Location:Sec:5 Twp: 7S 95WFootage: 197 FNL  2485 FEL
Log Types:CBL; HRI/SDL/DSN; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1564 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 415, Top: 0 ft., Bottom: 1564 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6627 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 975, Top: 2600 ft., Bottom: 6627 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1294 ft.NN
FORT UNION1656 ft.NN
MESAVERDE3428 ft.NN
CAMEO5897 ft.NN
ROLLINS6567 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/13/2007                Interval Top: 4701 ft.    Interval Bottom: 6498 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/14/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/13/2007
Treatment Summary:3000 GALS 7 1/2% HCL; 734,700# 30/50 SAND; 17,225 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6060 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/23/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1352
MCF_GAS 1142
TUBING_PRESS 1261
Perforation Data:
Interval Top:4701 ft.# Of Holes:125
Interval Bottom:6498 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)17916
GOR778956
GOR DeterminationMCFE
Average BOE per Day8.530
Average MCFE per Day49.471

 Federal Financial Assurance  i 

 Tribal Well  i No