Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12544
Well Classification: GW Status: PR - 2/6/2007
Well Name/No:GARFIELD COUNTY #RWF 311-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/6/2007
FacilityID:285772LocationID:335062
County:GARFIELD #045Location:NWNW 21 6S94W 6
Field:RULISON - #75400Elevation:5453 ft.
Basin:PICEANCE BASIN  
Planned Location:501FNL  786 FWLLat/Long: 39.516740 / -107.900100Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.516740 / -107.900100Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/6/2007             Measured TD: 7970 ft.    Vertical TD: 7944 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/6/2007
Wellbore PermitDIRECTIONAL
Permit #:20062538 Expiration Date:7/18/2007
Proposed Top PZ Location:Sec: Twp: Footage: 947 FNL  526 FWL
Bottom Hole Location:Sec:21 Twp: 6S 94W Footage: 947 FNL  526 FWL
Proposed Depth/Form:7963 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:10/23/2006
Spud Date:10/11/2006Spud Date Is:ACTUAL
Measured TD:7970 ft.Measured PB depth:7860 ft.
True Vertical TD:7944 ft.True Vertical PB depth:
Top PZ Location:Sec:21 Twp: 6S 94WFootage: 933 FNL  525 FWL
Bottom Hole Location:Sec:21 Twp: 6S 94WFootage: 933 FNL  525 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1129 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1129 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7958 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 990, Top: 2400 ft., Bottom: 7958 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1836 ft.NN
MESAVERDE4295 ft.NN
CAMEO7064 ft.NN
ROLLINS7915 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/6/2007                  Interval Top: 5681 ft.    Interval Bottom: 7684 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/24/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/23/2006
Treatment Summary:3292 GAL 7 1/2% HCL; 606,500# 20/40 SAND; 16,585 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7047 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/6/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1426
TUBING_PRESS 1359
Perforation Data:
Interval Top:5681 ft.# Of Holes:112
Interval Bottom:7684 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)33
Total Gas Produced (MCF)16383
GOR496454
GOR DeterminationMCFE
Average BOE per Day7.836
Average MCFE per Day45.445

 Federal Financial Assurance  i Y

 Tribal Well  i No