Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12463
Well Classification: GW Status: PR - 6/28/2006
Well Name/No:FEDERAL #PA 412-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62161
Facility Status:PRStatus Date6/28/2006
FacilityID:285420LocationID:335129
County:GARFIELD #045Location:SWNW 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5680 ft.
Basin:PICEANCE BASIN  
Planned Location:2274FNL  1035 FWLLat/Long: 39.496254 / -108.008689Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.496254 / -108.008690Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/26/2006             Measured TD: 7879 ft.    Vertical TD: 7807 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/26/2006
Wellbore PermitDIRECTIONAL
Permit #:20062103 Expiration Date:6/27/2007
Proposed Top PZ Location:Sec:28 Twp: 6S 95W Footage: 1427 FNL  892 FWL
Bottom Hole Location:Sec:28 Twp: 6S 95W Footage: 1427 FNL  892 FWL
Proposed Depth/Form:7959 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:10/14/2006
Spud Date:9/30/2006Spud Date Is:ACTUAL
Measured TD:7879 ft.Measured PB depth:7853 ft.
True Vertical TD:7807 ft.True Vertical PB depth:
Top PZ Location:Sec:28 Twp: 6S 95WFootage: 1427 FNL  892 FWL
Bottom Hole Location:Sec:28 Twp: 6S 95WFootage: 1427 FNL  892 FWL
Log Types:CBL; HIGH RES INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2346 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 0 ft., Bottom: 2346 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7878 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 910, Top: 3400 ft., Bottom: 7878 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2188 ft.NN
FORT UNION2528 ft.NN
MESAVERDE4404 ft.NN
CAMEO7087 ft.NN
ROLLINS7813 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/10/2006                Interval Top: 5761 ft.    Interval Bottom: 7570 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/11/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/7/2006
Treatment Summary:3740 GALS 7 1/2% HCL; 849,000# 30/50 SAND; 20,362 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7270 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/10/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 2975
MCF_GAS 1193
TUBING_PRESS 1657
Perforation Data:
Interval Top:5761 ft.# Of Holes:146
Interval Bottom:7570 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)10909
GOR574157
GOR DeterminationMCFE
Average BOE per Day5.204
Average MCFE per Day30.209

 Federal Financial Assurance  i Y

 Tribal Well  i No