Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12462
Well Classification: GW Status: PR - 6/28/2006
Well Name/No:FEDERAL #PA 413-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62161
Facility Status:PRStatus Date6/28/2006
FacilityID:285421LocationID:335129
County:GARFIELD #045Location:SWNW 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5680 ft.
Basin:PICEANCE BASIN  
Planned Location:2282FNL  1022 FWLLat/Long: 39.496233 / -108.008735Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.496234 / -108.008736Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/26/2006             Measured TD: 7802 ft.    Vertical TD: 7774 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/26/2006
Wellbore PermitDIRECTIONAL
Permit #:20062101 Expiration Date:6/27/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2527 FSL  722 FWL
Bottom Hole Location:Sec:28 Twp: 6S 95W Footage: 2527 FSL  722 FWL
Proposed Depth/Form:7793 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:9/28/2006
Spud Date:9/16/2006Spud Date Is:ACTUAL
Measured TD:7802 ft.Measured PB depth:7777 ft.
True Vertical TD:7774 ft.True Vertical PB depth:
Top PZ Location:Sec:28 Twp: 6S 95WFootage: 2535 FSL  723 FWL
Bottom Hole Location:Sec:28 Twp: 6S 95WFootage: 2535 FSL  723 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2363 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 2363 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7801 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 910, Top: 3650 ft., Bottom: 7801 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2099 ft.NN
MESAVERDE4283 ft.NN
CAMEO6941 ft.NN
ROLLINS7643 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/8/2006                 Interval Top: 5603 ft.    Interval Bottom: 7570 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/14/2006Choke Size:0.266 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/7/2006
Treatment Summary:3942 GALS 7 1/2% HCL; 859,400# 30/50 SAND; 19,687 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6962 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/8/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1131
MCF_GAS 966
TUBING_PRESS 853
Perforation Data:
Interval Top:5603 ft.# Of Holes:137
Interval Bottom:7570 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)11349
GOR540428
GOR DeterminationMCFE
Average BOE per Day5.414
Average MCFE per Day31.441

 Federal Financial Assurance  i Y

 Tribal Well  i No