Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12314
Well Classification: GW Status: PR - 6/5/2006
Well Name/No:N PARACHUTE #MF18A N04 696
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/5/2006
FacilityID:284968LocationID:335598
County:GARFIELD #045Location:NESW 4 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5866 ft.
Basin:PICEANCE BASIN  
Planned Location:1825FSL  2436 FWLLat/Long: 39.551725 / -108.112133Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.551727 / -108.112131Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/6/2006             Measured TD: 8425 ft.    Vertical TD: 8206 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/6/2006
Wellbore PermitDIRECTIONAL
Permit #:20061794 Expiration Date:6/4/2007
Proposed Top PZ Location:Sec:4 Twp: 6S 96W Footage: 1083 FSL  1802 FEL
Bottom Hole Location:Sec:4 Twp: 6S 96W Footage: 1083 FSL  1802 FEL
Proposed Depth/Form:9232 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15, 51, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/25/2006
Spud Date:9/14/2006Spud Date Is:ACTUAL
Measured TD:8425 ft.Measured PB depth:8365 ft.
True Vertical TD:8206 ft.True Vertical PB depth:8146 ft.
Top PZ Location:Sec:4 Twp: 6S 96WFootage: 1083 FSL  1802 FEL
Bottom Hole Location:Sec:4 Twp: 6S 96WFootage: 1083 FSL  1802 FEL
Log Types:CBL AND MUDLOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2542 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 661, Top: 0 ft., Bottom: 2554 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8410 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1582, Top: 2000 ft., Bottom: 8425 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK4856 ft.8277 ft.NN
ROLLINS8277 ft.8425 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 2/1/2011                  Interval Top: 4940 ft.    Interval Bottom: 8055 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/2/2007Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/28/2006
Treatment Summary:STAGES 1-9 TREATED WITH A TOTAL OF 58,618 BBLS OF SLICKWATER, 1,812,787 LBS 20-40 SAND AND 60 BBLS OF 15% HCI
Tubing Size:2.375 in.Tubing Setting Depth:7033 ft.
Tubing Packer Depth:0 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 0
BTU_GAS 1170
CASING_PRESS 913
MCF_GAS 753
TUBING_PRESS 264
Perforation Data:
Interval Top:4940 ft.# Of Holes:216
Interval Bottom:8055 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)102
Total Gas Produced (MCF)18067
GOR177127
GOR DeterminationMCFE
Average BOE per Day8.808
Average MCFE per Day51.089

 Federal Financial Assurance  i 

 Tribal Well  i No