Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12243
Well Classification: GW Status: PR - 5/8/2006
Well Name/No:CLOUGH #RWF 413-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/8/2006
FacilityID:284622LocationID:335068
County:GARFIELD #045Location:SWSW 15 6S94W 6
Field:RULISON - #75400Elevation:5770 ft.
Basin:PICEANCE BASIN  
Planned Location:1115FSL  1095 FWLLat/Long: 39.521180 / -107.880100Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.521187 / -107.880104Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/6/2006             Measured TD: 8580 ft.    Vertical TD: 8540 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/6/2006
Wellbore PermitDIRECTIONAL
Permit #:20061083 Expiration Date:5/7/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1564 FSL  643 FWL
Bottom Hole Location:Sec:15 Twp: 6S 94W Footage: 1571 FNL  655 FWL
Proposed Depth/Form:8606 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:3/28/2007
Spud Date:3/3/2007Spud Date Is:ACTUAL
Measured TD:8580 ft.Measured PB depth:8559 ft.
True Vertical TD:8540 ft.True Vertical PB depth:
Top PZ Location:Sec:15 Twp: 6S 94WFootage: 1585 FSL  654 FWL
Bottom Hole Location:Sec:15 Twp: 6S 94WFootage: 1585 FSL  654 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPRECTRAL DENSITY, DENSITY, DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1141 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 1141 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8560 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1130, Top: 4460 ft., Bottom: 8560 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2079 ft.NN
MESAVERDE4682 ft.NN
CAMEO7461 ft.NN
ROLLINS8466 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/27/2007                 Interval Top: 6100 ft.    Interval Bottom: 8445 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/14/2007Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/13/2007
Treatment Summary:3000 GALS 7 1/2% HCL, 810200 # 20/40 SAND, 21081 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7716 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/27/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1328
MCF_GAS 1060
TUBING_PRESS 1106
Perforation Data:
Interval Top:6100 ft.# Of Holes:126
Interval Bottom:8445 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)36
Total Gas Produced (MCF)16363
GOR454527
GOR DeterminationMCFE
Average BOE per Day7.822
Average MCFE per Day45.381

 Federal Financial Assurance  i 

 Tribal Well  i No