Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12235
Well Classification: GW Status: PR - 10/20/2008
Well Name/No:CLOUGH #RMV 157-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/20/2008
FacilityID:284630LocationID:335068
County:GARFIELD #045Location:SWSW 15 6S94W 6
Field:RULISON - #75400Elevation:5770 ft.
Basin:PICEANCE BASIN  
Planned Location:1067FSL  1120 FWLLat/Long: 39.521054 / -107.880022Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.521053 / -107.880020Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/20/2008             Measured TD: 8550 ft.    Vertical TD: 8464 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/20/2008
Wellbore PermitDIRECTIONAL
Permit #:20080305 Expiration Date:2/28/2009
Proposed Top PZ Location:Sec: Twp: Footage: 837 FSL  2003 FWL
Bottom Hole Location:Sec:15 Twp: 6S 94W Footage: 837 FSL  2003 FWL
Proposed Depth/Form:8651 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:5/4/2008
Spud Date:4/25/2008Spud Date Is:ACTUAL
Measured TD:8550 ft.Measured PB depth:8505 ft.
True Vertical TD:8464 ft.True Vertical PB depth:8419 ft.
Top PZ Location:Sec:15 Twp: 6S 94WFootage: 829 FSL  2009 FWL
Bottom Hole Location:Sec:15 Twp: 6S 94WFootage: 829 FSL  2009 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1137 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 273, Top: 0 ft., Bottom: 1139 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8540 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 937, Top: 3068 ft., Bottom: 8539 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2076 ft.NN
MESAVERDE4699 ft.NN
CAMEO7522 ft.NN
ROLLINS8444 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/20/2008                Interval Top: 6108 ft.    Interval Bottom: 7996 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/15/2008Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/14/2008
Treatment Summary:2201 GAS 7 1/2% HCL; 1646800# 20/40 SAND; 4264 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7503 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/20/2008Test Method:FLOWING
Hours Tested:19Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1172
CASING_PRESS 805
MCF_GAS 928
TUBING_PRESS 540
Perforation Data:
Interval Top:6108 ft.# Of Holes:139
Interval Bottom:7996 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)44
Total Gas Produced (MCF)19953
GOR453477
GOR DeterminationMCFE
Average BOE per Day9.528
Average MCFE per Day55.286

 Federal Financial Assurance  i 

 Tribal Well  i No