Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12014
Well Classification: GW Status: PR - 3/20/2006
Well Name/No:FEDERAL #PA 412-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date3/20/2006
FacilityID:283868LocationID:335169
County:GARFIELD #045Location:NWSW 27 6S95W 6
Field:PARACHUTE - #67350Elevation:5697 ft.
Basin:PICEANCE BASIN  
Planned Location:2237FSL  1241 FWLLat/Long: 39.494523 / -107.989300Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.494518 / -107.989310Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/24/2006             Measured TD: 8160 ft.    Vertical TD: 8064 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/24/2006
Wellbore PermitDIRECTIONAL
Permit #:20060331 Expiration Date:3/19/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2044 FNL  658 FWL
Bottom Hole Location:Sec:27 Twp: 6S 95W Footage: 2044 FNL  658 FWL
Proposed Depth/Form:8260 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:11/6/2006
Spud Date:10/20/2006Spud Date Is:ACTUAL
Measured TD:8160 ft.Measured PB depth:8137 ft.
True Vertical TD:8064 ft.True Vertical PB depth:
Top PZ Location:Sec:27 Twp: 6S 95WFootage: 2069 FNL  677 FWL
Bottom Hole Location:Sec:27 Twp: 6S 95WFootage: 2069 FNL  677 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2515 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 661, Top: 0 ft., Bottom: 2515 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8165 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 945, Top: 3700 ft., Bottom: 8165 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2304 ft.NN
MESAVERDE4603 ft.NN
CAMEO7395 ft.NN
ROLLINS8100 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/17/2006                Interval Top: 6000 ft.    Interval Bottom: 8029 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/24/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/17/2006
Treatment Summary:3500 GALS 7 1/2% HCL; 795,200# 30/50 SAND; 19,477 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7523 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/17/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1738
MCF_GAS 1203
TUBING_PRESS 1599
Perforation Data:
Interval Top:6000 ft.# Of Holes:119
Interval Bottom:8029 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)12143
GOR505958
GOR DeterminationMCFE
Average BOE per Day5.805
Average MCFE per Day33.670

 Federal Financial Assurance  i Y

 Tribal Well  i No