|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/1/2021 Measured TD: 7315 ft. Vertical TD: 6915 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20060291 | Expiration Date: | 3/9/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 666 FNL 1993 FWL | | Bottom Hole Location: | Sec:8 Twp: 7S 91W | Footage: 666 FNL 1993 FWL | | Proposed Depth/Form: | 7309 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/6/2006 | | Spud Date: | 8/23/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7315 ft. | Measured PB depth: | 7250 ft. | | True Vertical TD: | 6915 ft. | True Vertical PB depth: | 6850 ft. | | Top PZ Location: | Sec:8 Twp: 7S 91W | Footage: 645 FNL 2000 FWL | | Bottom Hole Location: | Sec:8 Twp: 7S 91W | Footage: 645 FNL 2000 FWL | | Log Types: | TRIPLE COMBO(TO BE SNT BY LOGGING CO),MUD LOG, TEMP.SURVEY,CEMENT BOND | | Casing: | String Type: CONDUCTOR, Hole Size: 18 in., Size: 14 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: 90 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1382 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 0 ft., Bottom: 1382 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7301 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 792, Top: 2306 ft., Bottom: 7301 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 3164 ft. | | N | N | | CAMEO COAL | 6735 ft. | | N | N | | ROLLINS | 7065 ft. | | N | N |
Formation RLNS Formation Classification: GW Status: PR - 12/1/2021 Interval Top: 7126 ft. Interval Bottom: 7132 ft.| Completed Information for Formation ROLLINS | | 1st Production Date: | 10/11/2006 | Choke Size: | | | Formation Name: | ROLLINS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/9/2006 | | Treatment Summary: | RLNS: FRAC'D W/ 2047 BBLS SLICKWATER & 56,250# 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RLNS. |
| | Perforation Data: | | Interval Top: | 7126 ft. | # Of Holes: | 21 | | Interval Bottom: | 7132 ft. | Hole Size: | 0.36 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 12/1/2021 Interval Top: 4573 ft. Interval Bottom: 6959 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 10/11/2006 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/9/2006 | | Treatment Summary: | WFCM: FRAC'D W/ 13,644 BBLS SLICKWATER & 300,500# 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 4573 ft. | # Of Holes: | 99 | | Interval Bottom: | 6959 ft. | Hole Size: | 0.36 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 3/11/2009 Interval Top: 4573 ft. Interval Bottom: 6959 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 10/11/2006 | Choke Size: | 0.750 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/6/2006 | | Treatment Summary: | 5 ZONES WERE ACIDIZED WITH 3750 GALLONS IN 5 STAGES. 5 ZONES WERE FRACTURE STIMULATED W/ A TOTAL OF 528,949 LBS OF 30/50 SAND IN 640,868 GALLONS OF SLICKWATER IN 5 STAGES. SEE WELLBORE DIAGRAM FOR DETAILS OF EACH TREATMENT. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6496 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/17/2006 | Test Method: | THROUGH SEPARAT | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 600 | | CALC_BBLS_H2O | 600 | | CALC_MCF_GAS | 650 | | CASING_PRESS | 850 | | MCF_GAS | 650 |
| | Perforation Data: | | Interval Top: | 4573 ft. | # Of Holes: | 120 | | Interval Bottom: | 6959 ft. | Hole Size: | 0.36 in. |
|
Formation WMRCM Formation Classification: GW Status: CM - 11/17/2006 Interval Top: 4573 ft. Interval Bottom: 7132 ft.| Completed Information for Formation WILLIAMS FK-ROLLINS-CAMEO | | 1st Production Date: | 10/11/2006 | Choke Size: | 0.750 in. | | Formation Name: | WILLIAMS FK-ROLLINS-CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/9/2006 | | Treatment Summary: | SEE INDIVIDUAL FORMATION BREAKDOWN |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6496 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/17/2006 | Test Method: | SEPARATOR | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 600 | | BBLS_OIL | 0 | | BTU_GAS | 1064 | | CALC_BBLS_H2O | 600 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 650 | | CASING_PRESS | 850 | | MCF_GAS | 650 |
| | Perforation Data: | | Interval Top: | 4573 ft. | # Of Holes: | 120 | | Interval Bottom: | 7132 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 2 |
| Total Gas Produced (MCF) | 1153 |
| GOR | 576500 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.548 |
| Average MCFE per Day | 3.194 |
| Federal Financial Assurance | i | Y |
|
|