Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11979
Well Classification: GW Status: PR - 8/3/2006
Well Name/No:FEDERAL #PA 414-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date8/3/2006
FacilityID:283730LocationID:335125
County:GARFIELD #045Location:NWNW 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5968 ft.
Basin:PICEANCE BASIN  
Planned Location:322FNL  116 FWLLat/Long: 39.501614 / -108.011800Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.501614 / -108.011810Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/3/2006             Measured TD: 8438 ft.    Vertical TD: 4348 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/3/2006
Wellbore PermitDIRECTIONAL
Permit #:20060294 Expiration Date:3/8/2007
Proposed Top PZ Location:Sec: Twp: Footage: 594 FNL  815 FWL
Bottom Hole Location:Sec:21 Twp: 6S 95W Footage: 594 FSL  815 FWL
Proposed Depth/Form:8405 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/13/2006
Spud Date:5/27/2006Spud Date Is:ACTUAL
Measured TD:8438 ft.Measured PB depth:8233 ft.
True Vertical TD:4348 ft.True Vertical PB depth:
Top PZ Location:Sec:21 Twp: 6S 95WFootage: 591 FSL  810 FWL
Bottom Hole Location:Sec:21 Twp: 6S 95WFootage: 591 FSL  810 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2753 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 752, Top: 0 ft., Bottom: 2753 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8421 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 5100 ft., Bottom: 8421 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2569 ft.NN
FORT UNION2906 ft.NN
MESAVERDE4777 ft.NN
CAMEO7545 ft.NN
ROLLINS8270 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/3/2006                  Interval Top: 6229 ft.    Interval Bottom: 8233 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/25/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/23/2006
Treatment Summary:4074 GALS 7 1/2% HCL; 769900# 20/40 SAND; 21093 BLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7672 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1141
CASING_PRESS 1554
TUBING_PRESS 1359
Perforation Data:
Interval Top:6229 ft.# Of Holes:159
Interval Bottom:8233 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)40
Total Gas Produced (MCF)15746
GOR393650
GOR DeterminationMCFE
Average BOE per Day7.545
Average MCFE per Day43.790

 Federal Financial Assurance  i Y

 Tribal Well  i No