Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11977
Well Classification: GW Status: PR - 1/8/2007
Well Name/No:FEDERAL #PA 422-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date1/8/2007
FacilityID:283732LocationID:335168
County:GARFIELD #045Location:SENW 27 6S95W 6
Field:PARACHUTE - #67350Elevation:5837 ft.
Basin:PICEANCE BASIN  
Planned Location:2164FNL  1285 FWLLat/Long: 39.496566 / -107.989118Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.496566 / -107.989118Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/8/2007             Measured TD: 8416 ft.    Vertical TD: 8362 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/8/2007
Wellbore PermitDIRECTIONAL
Permit #:20070077 Expiration Date:1/22/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2084 FNL  2046 FWL
Bottom Hole Location:Sec:27 Twp: 6S 95W Footage: 2084 FNL  2046 FWL
Proposed Depth/Form:8422 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-25 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:5/20/2007
Spud Date:5/6/2007Spud Date Is:ACTUAL
Measured TD:8416 ft.Measured PB depth:7732 ft.
True Vertical TD:8362 ft.True Vertical PB depth:
Top PZ Location:Sec:27 Twp: 6S 95WFootage: 2093 FNL  2001 FWL
Bottom Hole Location:Sec:27 Twp: 6S 95WFootage: 2093 FNL  2001 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2705 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 714, Top: 0 ft., Bottom: 2705 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8403 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 985, Top: 4200 ft., Bottom: 8403 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2451 ft.NN
FORT UNION2736 ft.NN
MESAVERDE4775 ft.NN
CAMEO7577 ft.NN
ROLLINS8258 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/13/2007                 Interval Top: 5956 ft.    Interval Bottom: 8191 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/29/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/28/2007
Treatment Summary:3500 GALS 7 1/2 % HCL; 794,000# 30/50 SAND; 18,790 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7439 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/13/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 2004
MCF_GAS 1198
TUBING_PRESS 1778
Perforation Data:
Interval Top:5956 ft.# Of Holes:147
Interval Bottom:8191 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)36
Total Gas Produced (MCF)20221
GOR561694
GOR DeterminationMCFE
Average BOE per Day9.651
Average MCFE per Day55.993

 Federal Financial Assurance  i Y

 Tribal Well  i No