Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11957
Well Classification: GW Status: PR - 3/2/2006
Well Name/No:FEDERAL #GM 343-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 24603
Facility Status:PRStatus Date3/2/2006
FacilityID:283578LocationID:334718
County:GARFIELD #045Location:NESE 4 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6065 ft.
Basin:PICEANCE BASIN  
Planned Location:1749FSL  764 FELLat/Long: 39.463507 / -108.107800Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.463509 / -108.107809Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/18/2006             Measured TD: 7013 ft.    Vertical TD: 6900 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/18/2006
Wellbore PermitDIRECTIONAL
Permit #:20060240 Expiration Date:3/1/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2404 FSL  125 FEL
Bottom Hole Location:Sec: Twp: Footage: 2404 FSL  125 FEL
Proposed Depth/Form:7015 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:11/13/2006
Spud Date:11/1/2006Spud Date Is:ACTUAL
Measured TD:7013 ft.Measured PB depth:6928 ft.
True Vertical TD:6900 ft.True Vertical PB depth:
Top PZ Location:Sec:4 Twp: 7S 96WFootage: 2419 FSL  120 FEL
Bottom Hole Location:Sec:4 Twp: 7S 96WFootage: 2419 FSL  120 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1136 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1136 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6995 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 2700 ft., Bottom: 6995 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2216 ft.NN
FORT UNION2529 ft.NN
MESAVERDE3857 ft.NN
CAMEO6401 ft.NN
ROLLINS6870 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/4/2007                  Interval Top: 5101 ft.    Interval Bottom: 6778 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/23/2007Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/8/2006
Treatment Summary:3067 GALS 7 1/2% HCL; 853,600# 30/50 SAND; 15,866 BBLS SLICKWATER; 683 TONS CO2
Tubing Size:2.375 in.Tubing Setting Depth:6389 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/4/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1466
MCF_GAS 1136
TUBING_PRESS 1353
Perforation Data:
Interval Top:5101 ft.# Of Holes:99
Interval Bottom:6778 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)13462
GOR560916
GOR DeterminationMCFE
Average BOE per Day6.426
Average MCFE per Day37.278

 Federal Financial Assurance  i Y

 Tribal Well  i No