Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11879
Well Classification: GW Status: PR - 1/31/2006
Well Name/No:KNIGHT #PA 412-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/31/2006
FacilityID:282952LocationID:334598
County:GARFIELD #045Location:NWNW 3 7S95W 6
Field:PARACHUTE - #67350Elevation:5153 ft.
Basin:PICEANCE BASIN  
Planned Location:878FNL  296 FWLLat/Long: 39.471046 / -107.992570Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.471045 / -107.992576Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/16/2005             Measured TD: 6847 ft.    Vertical TD: 6654 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/16/2005
Wellbore PermitDIRECTIONAL
Permit #:20055055 Expiration Date:1/30/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2051 FNL  549 FWL
Bottom Hole Location:Sec:3 Twp: 7S 95W Footage: 2051 FNL  549 FWL
Proposed Depth/Form:6876 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: 640, Drill Unit: SEC.

Wellbore Completed
Completion Date:4/14/2006
Spud Date:4/5/2006Spud Date Is:ACTUAL
Measured TD:6847 ft.Measured PB depth:6795 ft.
True Vertical TD:6654 ft.True Vertical PB depth:
Top PZ Location:Sec:3 Twp: 7S 95WFootage: 2068 FNL  573 FWL
Bottom Hole Location:Sec:3 Twp: 7S 95WFootage: 2068 FNL  573 FWL
Log Types:CBL,PLATFORM EXPRESS,GAMMA RAY,ARRAY INDUCTION/SP
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1462 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1461 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6839 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 925, Top: 2800 ft., Bottom: 6838 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1230 ft.NN
FORT UNION1497 ft.NN
MESAVERDE3432 ft.NN
CAMEO COAL6067 ft.NN
ROLLINS6752 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/16/2006                 Interval Top: 4816 ft.    Interval Bottom: 6681 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/19/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/15/2006
Treatment Summary:3502 GALS 7 1/2% HCL; 885,200# 30/50 SAND; 20,511 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6306 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/16/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1824
MCF_GAS 1512
TUBING_PRESS 11759
Perforation Data:
Interval Top:4816 ft.# Of Holes:138
Interval Bottom:6681 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)22467
GOR774724
GOR DeterminationMCFE
Average BOE per Day10.699
Average MCFE per Day62.065

 Federal Financial Assurance  i 

 Tribal Well  i No