Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11677
Well Classification: GW Status: PR - 12/16/2005
Well Name/No:PUCKETT #PA 532-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/16/2005
FacilityID:39LocationID:335059
County:GARFIELD #045Location:NWNE 35 6S95W 6
Field:PARACHUTE - #67350Elevation:5150 ft.
Basin:PICEANCE BASIN  
Planned Location:956FNL  2059 FELLat/Long: 39.485907 / -107.963523Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485906 / -107.963521Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/5/2005             Measured TD: 7685 ft.    Vertical TD: 7360 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/5/2005
Wellbore PermitDIRECTIONAL
Permit #:20054330 Expiration Date:12/15/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2573 FNL  2665 FEL
Bottom Hole Location:Sec: Twp: Footage: 2573 FNL  2665 FEL
Proposed Depth/Form:7795 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:2/12/2006
Spud Date:1/25/2006Spud Date Is:ACTUAL
Measured TD:7685 ft.Measured PB depth:7600 ft.
True Vertical TD:7360 ft.True Vertical PB depth:
Top PZ Location:Sec:35 Twp: 6S 95WFootage: 2572 FNL  2635 FEL
Bottom Hole Location:Sec:35 Twp: 6S 95WFootage: 2572 FNL  2635 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2039 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 2039 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7675 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1010, Top: 3100 ft., Bottom: 7675 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1800 ft.NN
FORT UNION2095 ft.NN
MESAVERDE4196 ft.NN
CAMEO7001 ft.NN
ROLLINS7687 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/18/2006                 Interval Top: 5602 ft.    Interval Bottom: 7519 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/17/2006Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/16/2006
Treatment Summary:2573 GALS 7 1/2% HCL; 660,500# 30/50 SAND; 15,380 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6918 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/18/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1447
MCF_GAS 877
TUBING_PRESS 1134
Perforation Data:
Interval Top:5602 ft.# Of Holes:102
Interval Bottom:7519 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)13697
GOR805705
GOR DeterminationMCFE
Average BOE per Day6.512
Average MCFE per Day37.820

 Federal Financial Assurance  i 

 Tribal Well  i No