Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11669
Well Classification: GW Status: PR - 5/27/2006
Well Name/No:PUCKETT/TOSCO #PA 421-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/27/2006
FacilityID:17LocationID:335072
County:GARFIELD #045Location:NENW 35 6S95W 6
Field:PARACHUTE - #67350Elevation:5165 ft.
Basin:PICEANCE BASIN  
Planned Location:1167FNL  1825 FWLLat/Long: 39.485282 / -107.968850Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485304 / -107.968902Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/27/2006             Measured TD: 7703 ft.    Vertical TD: 7630 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/27/2006
Wellbore PermitDIRECTIONAL
Permit #:20054478 Expiration Date:12/15/2006
Proposed Top PZ Location:Sec: Twp: Footage: 567 FNL  2160 FWL
Bottom Hole Location:Sec: Twp: Footage: 567 FNL  2160 FWL
Proposed Depth/Form:7695 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:3/14/2006
Spud Date:3/1/2006Spud Date Is:ACTUAL
Measured TD:7703 ft.Measured PB depth:7670 ft.
True Vertical TD:7630 ft.True Vertical PB depth:
Top PZ Location:Sec:35 Twp: 6S 95WFootage: 560 FNL  2134 FWL
Bottom Hole Location:Sec:35 Twp: 6S 95WFootage: 560 FNL  2134 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1954 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 1954 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7702 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1030, Top: 2600 ft., Bottom: 7702 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1774 ft.NN
FORT UNION2067 ft.NN
MESAVERDE4120 ft.NN
CAMEO6946 ft.NN
ROLLINS7604 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/27/2006                 Interval Top: 5442 ft.    Interval Bottom: 7516 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/9/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/8/2006
Treatment Summary:3,546 GALS 7 1/2% HCL; 844,200# 30/50 SAND; 20,102 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7149 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/27/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1013
CASING_PRESS 1387
MCF_GAS 1013
TUBING_PRESS 1222
Perforation Data:
Interval Top:5442 ft.# Of Holes:136
Interval Bottom:7516 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)7548
GOR686181
GOR DeterminationMCFE
Average BOE per Day3.597
Average MCFE per Day20.860

 Federal Financial Assurance  i 

 Tribal Well  i No