Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11663
Well Classification: GW Status: PR - 7/10/2006
Well Name/No:LINDAUER #GM 441-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/10/2006
FacilityID:7LocationID:334949
County:GARFIELD #045Location:NENE 11 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5346 ft.
Basin:PICEANCE BASIN  
Planned Location:1189FNL  1112 FELLat/Long: 39.456167 / -108.071901Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.456367 / -108.072167Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/10/2006             Measured TD: 6591 ft.    Vertical TD: 6413 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/10/2006
Wellbore PermitDIRECTIONAL
Permit #:20054356 Expiration Date:12/15/2006
Proposed Top PZ Location:Sec: Twp: Footage: 207 FNL  496 FEL
Bottom Hole Location:Sec: Twp: Footage: 207 FNL  496 FEL
Proposed Depth/Form:6590 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:5/2/2006
Spud Date:4/24/2006Spud Date Is:ACTUAL
Measured TD:6591 ft.Measured PB depth:6460 ft.
True Vertical TD:6413 ft.True Vertical PB depth:
Top PZ Location:Sec:11 Twp: 7S 96WFootage: 193 FNL  500 FEL
Bottom Hole Location:Sec:11 Twp: 7S 96WFootage: 193 FNL  500 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1129 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1129 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6570 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 826, Top: 3720 ft., Bottom: 6571 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1576 ft.NN
FORT UNION1882 ft.NN
MESAVERDE3431 ft.NN
CAMEO5973 ft.NN
ROLLINS6435 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/10/2006                 Interval Top: 4653 ft.    Interval Bottom: 6353 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/3/2006Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/27/2006
Treatment Summary:3029 GALS 7.5% HCL; 890500# 30/50 SAND; 20613 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5828 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/10/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1216
CASING_PRESS 1390
TUBING_PRESS 1269
Perforation Data:
Interval Top:4653 ft.# Of Holes:123
Interval Bottom:6353 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)22
Total Gas Produced (MCF)16683
GOR758318
GOR DeterminationMCFE
Average BOE per Day7.934
Average MCFE per Day46.054

 Federal Financial Assurance  i 

 Tribal Well  i No