Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11426
Well Classification: GW Status: PR - 3/20/2006
Well Name/No:AMERICAN SODA #GM 414-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/20/2006
FacilityID:281275LocationID:334773
County:GARFIELD #045Location:SWSW 35 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5350 ft.
Basin:PICEANCE BASIN  
Planned Location:841FSL  460 FWLLat/Long: 39.475559 / -108.083586Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.475640 / -108.083550Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/20/2006             Measured TD: 6621 ft.    Vertical TD: 6551 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/20/2006
Wellbore PermitDIRECTIONAL
Permit #:20053766 Expiration Date:11/13/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1202 FSL  1104 FWL
Bottom Hole Location:Sec: Twp: Footage: 1202 FSL  1104 FWL
Proposed Depth/Form:6713 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:1/2/2006
Spud Date:12/22/2005Spud Date Is:ACTUAL
Measured TD:6621 ft.Measured PB depth:6558 ft.
True Vertical TD:6551 ft.True Vertical PB depth:
Top PZ Location:Sec:35 Twp: 6S 96WFootage: 1219 FSL  1115 FWL
Bottom Hole Location:Sec:35 Twp: 6S 96WFootage: 1219 FSL  1115 FWL
Log Types:CBL, HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1123 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1123 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6587 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 2450 ft., Bottom: 6587 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1680 ft.NN
FORT UNION2011 ft.NN
MESAVERDE3501 ft.NN
CAMEO6079 ft.NN
ROLLINS6567 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/20/2006                 Interval Top: 4756 ft.    Interval Bottom: 6532 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/10/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/4/2006
Treatment Summary:4521 GALS 7.5% HCL; 851000# 30/50 SAND; 19780 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5960 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/20/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1543
CASING_PRESS 1335
TUBING_PRESS 1196
Perforation Data:
Interval Top:4756 ft.# Of Holes:121
Interval Bottom:6532 ft.Hole Size:0.35 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
11/2024 - 10/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)1225
GOR
GOR DeterminationMCFE
Average BOE per Day0.578
Average MCFE per Day3.357

 Federal Financial Assurance  i Y

 Tribal Well  i No