|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/1/2022 Measured TD: 12348 ft. Vertical TD: 12236 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/20/2011 | | Proposed Top PZ Location: | Sec:15 Twp: 5S 95W | Footage: 2282 FNL 2172 FEL | | Bottom Hole Location: | Sec:15 Twp: 5S 95W | Footage: 2282 FNL 2172 FEL | | Proposed Depth/Form: | 13000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: , Depth: 90 ft., Weight: 55 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: , Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 0 ft., Bottom: 2500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 13166 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1380, Top: 200 ft., Bottom: 13166 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/8/2010 | | Spud Date: | 9/26/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 12348 ft. | Measured PB depth: | 12340 ft. | | True Vertical TD: | 12236 ft. | True Vertical PB depth: | 12228 ft. | | Top PZ Location: | Sec:15 Twp: 5S 95W | Footage: 2282 FNL 2172 FEL | | Bottom Hole Location: | Sec:15 Twp: 5S 95W | Footage: 2282 FNL 2172 FEL | | Log Types: | RSt/CBL combo | | Log Types: | ATTACHED TO PREVIOUS FORM 5 THAT WAS SUBMITTED ON 12-13-10 | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 55 , Citings Type: ACTUAL | | Cement: | Sacks: 507, Top: 0 ft., Bottom: 123 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2723 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1500, Top: 0 ft., Bottom: 2748 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12340 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 763, Top: 7400 ft., Bottom: 12340 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 8754 ft. | | | | | ROLLINS | 12140 ft. | | | |
Formation WMFK Formation Classification: GW Status: PR - 8/1/2022 Interval Top: 9188 ft. Interval Bottom: 11582 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 1/26/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/12/2011 | | Treatment Summary: | Completed 5 stages of initial completion using 834,360 lbs 20/40 white sand, 33,355 bbls slickwater fluid and 2,500 gal 7/5% acid.
Stage 1 - 11,050-11,582' - 26 holes @ 2 spf. Frac'd w/ 127,850 lbs 20/40 white sand and 2,789 bbl slickwater. Led w/ 500 gal 7.5% acid.
Stage 2 - 10,655-10,949' - 34 holes @ 2 spf. Frac'd w/ 209,000 lbs 20/40 white sand and 9,068 bbl slickwater. Led w/ 500 gal 7.5% acid.
Stage 3 - 10,190-10575' - 32 holes @ 2 spf. Frac'd w/ 175,250 lbs 20/40 white sand and 7,912 bbl slickwater. Led w/ 500 gal 7.5% acid.
Stage 4 - 9,687-10,025' - 28 holes @ 2 spf. Frac'd w/ 164,000 lbs 20/40 white sand and 7,133 bbl slickwater. Led w/ 500 gal 7.5% acid.
Stage 5- 9,188-9561' - 24 holes @ 2 spf. Frac'd w/ 158,260 lbs 20/40 white sand and 6,453 bbl slickwater. Led w/ 500 gal 7.5% acid. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11043 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/27/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 473 | | CALC_BBLS_H2O | 473 | | CALC_MCF_GAS | 216 | | CASING_PRESS | 1600 | | MCF_GAS | 216 | | TUBING_PRESS | 1150 |
| | Perforation Data: | | Interval Top: | 9188 ft. | # Of Holes: | 144 | | Interval Bottom: | 11582 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 48 |
| Total Gas Produced (MCF) | 8501 |
| GOR | 177104 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.147 |
| Average MCFE per Day | 24.076 |
| Federal Financial Assurance | i | |
|
|