Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11250
Well Classification: GW Status: PR - 9/17/2008
Well Name/No:N.PARACHUTE EF #08D 130 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/17/2008
FacilityID:280388LocationID:335588
County:GARFIELD #045Location:NESE 30 5S95W 6
Field:GRAND VALLEY - #31290Elevation:5989 ft.
Basin:PICEANCE BASIN  
Planned Location:1896FSL  497 FELLat/Long: 39.582697 / -108.089167Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.582764 / -108.089114Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/17/2008             Measured TD: 9550 ft.    Vertical TD: 9388 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/17/2008
Wellbore PermitDIRECTIONAL
Permit #:20052527 Expiration Date:9/29/2006
Proposed Top PZ Location:Sec:30 Twp: 5S 95W Footage: 2332 FNL  333 FEL
Bottom Hole Location:Sec:30 Twp: 5S 95W Footage: 2332 FNL  333 FEL
Proposed Depth/Form:10206 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/2/2006
Spud Date:12/12/2005Spud Date Is:ACTUAL
Measured TD:9550 ft.Measured PB depth:9503 ft.
True Vertical TD:9388 ft.True Vertical PB depth:9341 ft.
Top PZ Location:Sec:30 Twp: 5S 95WFootage: 2282 FNL  242 FEL
Bottom Hole Location:Sec:30 Twp: 5S 95WFootage: 2282 FNL  242 FEL
Log Types:CBL, MUD AND ARRAY INDUCTION
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 120 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2591 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 0 ft., Bottom: 2591 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9550 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1510, Top: 2050 ft., Bottom: 9550 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH3659 ft.5822 ft.NN
WILLIAMS FORK5822 ft.9372 ft.NN
ROLLINS9372 ft.9550 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/17/2008                 Interval Top: 6096 ft.    Interval Bottom: 9244 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/22/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/11/2006
Treatment Summary:SEE SCANNED DOCUMENT
Tubing Size:2.375 in.Tubing Setting Depth:8176 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/17/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 1272
CASING_PRESS 963
MCF_GAS 1272
TUBING_PRESS 234
Perforation Data:
Interval Top:6096 ft.# Of Holes:162
Interval Bottom:9244 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)59
Total Gas Produced (MCF)11871
GOR201203
GOR DeterminationMCFE
Average BOE per Day5.773
Average MCFE per Day33.462

 Federal Financial Assurance  i 

 Tribal Well  i No