Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11207
Well Classification: GW Status: PR - 6/8/2006
Well Name/No:CLOUGH #RWF 343-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/8/2006
FacilityID:280125LocationID:335065
County:GARFIELD #045Location:SESE 14 6S94W 6
Field:RULISON - #75400Elevation:5296 ft.
Basin:PICEANCE BASIN  
Planned Location:1308FSL  1248 FELLat/Long: 39.521519 / -107.850849Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.521538 / -107.850777Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/8/2006             Measured TD: 8310 ft.    Vertical TD: 8262 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/8/2006
Wellbore PermitDIRECTIONAL
Permit #:20062872 Expiration Date:8/10/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1587 FSL  616 FEL
Bottom Hole Location:Sec: Twp: Footage: 1587 FSL  616 FEL
Proposed Depth/Form:8142 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:1/25/2007
Spud Date:1/12/2007Spud Date Is:ACTUAL
Measured TD:8310 ft.Measured PB depth:8204 ft.
True Vertical TD:8262 ft.True Vertical PB depth:
Top PZ Location:Sec:14 Twp: 6S 94WFootage: 1591 FSL  631 FEL
Bottom Hole Location:Sec:14 Twp: 6S 94WFootage: 1591 FSL  631 FEL
Log Types:CBL; HIGH RESOLUTION IND, SPECTRAL DENS, DUAL SPACED NEU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1145 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 293, Top: 0 ft., Bottom: 1145 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8292 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1195, Top: 2760 ft., Bottom: 8292 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1728 ft.NN
MESAVERDE4343 ft.NN
CAMEO7212 ft.NN
ROLLINS8187 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/17/2007                 Interval Top: 5912 ft.    Interval Bottom: 8053 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/18/2007Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/12/2007
Treatment Summary:3750 GALS 7 1/2% HCL, 748300# 20/40 SAND, 29220 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7608 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/17/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1753
MCF_GAS 1066
TUBING_PRESS 1463
Perforation Data:
Interval Top:5912 ft.# Of Holes:125
Interval Bottom:8053 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)40
Total Gas Produced (MCF)19818
GOR495450
GOR DeterminationMCFE
Average BOE per Day9.474
Average MCFE per Day54.939

 Federal Financial Assurance  i 

 Tribal Well  i No