Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11185
Well Classification: GW Status: PR - 8/31/2007
Well Name/No:CLOUGH #RWF 543-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/31/2007
FacilityID:280100LocationID:335064
County:GARFIELD #045Location:SWSE 15 6S94W 6
Field:RULISON - #75400Elevation:5566 ft.
Basin:PICEANCE BASIN  
Planned Location:1072FSL  1504 FELLat/Long: 39.520879 / -107.870440Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.520909 / -107.870365Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/31/2007             Measured TD: 8505 ft.    Vertical TD: 8410 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/31/2007
Wellbore PermitDIRECTIONAL
Permit #:20062894 Expiration Date:8/16/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1571 FSL  676 FEL
Bottom Hole Location:Sec: Twp: Footage: 1571 FSL  676 FEL
Proposed Depth/Form:8334 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-41 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:3/17/2007
Spud Date:2/28/2007Spud Date Is:ACTUAL
Measured TD:8505 ft.Measured PB depth:8400 ft.
True Vertical TD:8410 ft.True Vertical PB depth:8305 ft.
Top PZ Location:Sec:15 Twp: 6S 94WFootage: 1570 FSL  661 FEL
Bottom Hole Location:Sec:15 Twp: 6S 94WFootage: 1570 FSL  661 FEL
Log Types:CBL, HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1153 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1153 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8488 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1146, Top: 3790 ft., Bottom: 8488 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1952 ft.NN
MESAVERDE4547 ft.NN
CAMEO7430 ft.NN
ROLLINS8326 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/31/2007                 Interval Top: 6174 ft.    Interval Bottom: 8275 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/22/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/13/2007
Treatment Summary:3500 GALS 7 1/2% HCL; 570104# 20/40 SAND; 14999 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:7496 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1087
CALC_GOR 0
CASING_PRESS 1051
MCF_GAS 957
TUBING_PRESS 829
Perforation Data:
Interval Top:6174 ft.# Of Holes:193
Interval Bottom:8275 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)9273
GOR463650
GOR DeterminationMCFE
Average BOE per Day4.435
Average MCFE per Day25.734

 Federal Financial Assurance  i 

 Tribal Well  i No