Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11150
Well Classification: GW Status: PR - 6/8/2006
Well Name/No:CLOUGH #RWF 541-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CR62
Facility Status:PRStatus Date6/8/2006
FacilityID:280015LocationID:311629
County:GARFIELD #045Location:SWNE 16 6S94W 6
Field:RULISON - #75400Elevation:5966 ft.
Basin:PICEANCE BASIN  
Planned Location:1603FNL  1924 FELLat/Long: 39.527949 / -107.890750Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.528044 / -107.890625Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/8/2006             Measured TD: 8750 ft.    Vertical TD: 8598 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/8/2006
Wellbore PermitDIRECTIONAL
Permit #:20062850 Expiration Date:8/15/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1225 FNL  679 FEL
Bottom Hole Location:Sec:16 Twp: 6S 94W Footage: 1225 FNL  679 FEL
Proposed Depth/Form:8769 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:9/17/2006
Spud Date:7/13/2006Spud Date Is:ACTUAL
Measured TD:8750 ft.Measured PB depth:8662 ft.
True Vertical TD:8598 ft.True Vertical PB depth:
Top PZ Location:Sec:16 Twp: 6S 94WFootage: 1224 FNL  691 FEL
Bottom Hole Location:Sec:16 Twp: 6S 94WFootage: 1224 FNL  691 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2681 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 593, Top: 0 ft., Bottom: 2681 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8731 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 986, Top: 3250 ft., Bottom: 8731 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4053 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 3904 ft., Bottom: 4053 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH G2420 ft.NN
MESAVERDE5002 ft.NN
CAMEO7804 ft.NN
ROLLINS8740 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/26/2007                 Interval Top: 6490 ft.    Interval Bottom: 8516 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/25/2006Choke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/17/2006
Treatment Summary:4,000 GALS 7.5% HCL; 861,000# 20/40 SAND; 19,952 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7940 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/26/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 743
MCF_GAS 1266
TUBING_PRESS 690
Perforation Data:
Interval Top:6490 ft.# Of Holes:140
Interval Bottom:8516 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)93
Total Gas Produced (MCF)21897
GOR235451
GOR DeterminationMCFE
Average BOE per Day10.599
Average MCFE per Day61.479

 Federal Financial Assurance  i Y

 Tribal Well  i No