Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11116
Well Classification: GW Status: PR - 6/8/2006
Well Name/No:CLOUGH #RWF 12-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/8/2006
FacilityID:279931LocationID:335571
County:GARFIELD #045Location:SWNW 15 6S94W 6
Field:RULISON - #75400Elevation:5769 ft.
Basin:PICEANCE BASIN  
Planned Location:1551FNL  1269 FWLLat/Long: 39.528109 / -107.879430Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.528205 / -107.879306Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/8/2006             Measured TD: 8702 ft.    Vertical TD: 8654 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/8/2006
Wellbore PermitDIRECTIONAL
Permit #:20062866 Expiration Date:8/16/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1392 FNL  582 FWL
Bottom Hole Location:Sec: Twp: Footage: 1392 FNL  582 FWL
Proposed Depth/Form:8680 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-41 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:11/18/2006
Spud Date:10/29/2006Spud Date Is:ACTUAL
Measured TD:8702 ft.Measured PB depth:8590 ft.
True Vertical TD:8654 ft.True Vertical PB depth:
Top PZ Location:Sec:15 Twp: 6S 94WFootage: 1384 FNL  581 FWL
Bottom Hole Location:Sec:15 Twp: 6S 94WFootage: 1384 FNL  581 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1107 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 1107 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8656 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1120, Top: 4620 ft., Bottom: 8656 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2216 ft.NN
MESAVERDE4779 ft.NN
CAMEO7583 ft.NN
ROLLINS8575 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/24/2007                 Interval Top: 6514 ft.    Interval Bottom: 8354 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/21/2007Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/20/2007
Treatment Summary:2,500 GALS 7.5% HCL; 539,500# 20/40 SAND; 14,608 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7938 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/24/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 2811
MCF_GAS 1005
TUBING_PRESS 2677
Perforation Data:
Interval Top:6514 ft.# Of Holes:88
Interval Bottom:8354 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)13766
GOR491642
GOR DeterminationMCFE
Average BOE per Day6.578
Average MCFE per Day38.164

 Federal Financial Assurance  i 

 Tribal Well  i No