Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10997
Well Classification: GW Status: PR - 8/31/2010
Well Name/No:PUCKETT #246-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/31/2010
FacilityID:279097LocationID:324324
County:GARFIELD #045Location:NESW 1 7S97W 6
Field:GRAND VALLEY - #31290Elevation:8216 ft.
Basin:PICEANCE BASIN  
Planned Location:1556FSL  2320 FWLLat/Long: 39.471612 / -108.169756Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.471640 / -108.169750Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/31/2010             Measured TD: 8705 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/31/2010
Wellbore Permit
Permit #:20063940 Expiration Date:8/17/2007
Proposed Depth/Form:9200 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-21 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/6/2006
Spud Date:10/27/2006Spud Date Is:ACTUAL
Measured TD:8705 ft.Measured PB depth:8438 ft.
True Vertical TD:True Vertical PB depth:
Log Types:PNDL/GR; TEMPERATURE LOG; CBL/GR; MUD
Casing:String Type: CONDUCTOR, Hole Size: 32 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2492 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2492 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8494 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1450, Top: 5710 ft., Bottom: 8494 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4146 ft.NN
FORT UNION4476 ft.NN
WILLIAMS FORK - CAMEO5530 ft.NN
CAMEO8014 ft.NN
ROLLINS8496 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/31/2010                 Interval Top: 7256 ft.    Interval Bottom: 8233 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/14/2007Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/18/2007
Treatment Summary:FRAC'D USING 16341 BBLS OF SLICKWATER GEL AND 593240 LBS OF 20/40 MES WHITE SAND.
Tubing Size:2.375 in.Tubing Setting Depth:8132 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/1/2007Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 1
BTU_GAS 1079
CALC_BBLS_H2O 4
CALC_BBLS_OIL 1
CALC_GOR 101400
CALC_MCF_GAS 1014
CASING_PRESS 1259
GRAVITY_OIL 58
MCF_GAS 1014
TUBING_PRESS 1130
Perforation Data:
Interval Top:7256 ft.# Of Holes:110
Interval Bottom:8233 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1
Total Gas Produced (MCF)50774
GOR50774000
GOR DeterminationMCFE
Average BOE per Day23.983
Average MCFE per Day139.122

 Federal Financial Assurance  i 

 Tribal Well  i No