Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10932
Well Classification: GW Status: PR - 4/17/2006
Well Name/No:BOSELY #GM 334-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/17/2006
FacilityID:278771LocationID:334753
County:GARFIELD #045Location:SWSE 14 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5170 ft.
Basin:PICEANCE BASIN  
Planned Location:900FSL  1947 FELLat/Long: 39.432679 / -108.074845Lat/Long Source: Calculated From Footages
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/17/2006             Measured TD: 5735 ft.    Vertical TD: 5730 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/17/2006
Wellbore PermitDIRECTIONAL
Permit #:20061887 Expiration Date:6/22/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1090 FSL  1996 FEL
Bottom Hole Location:Sec: Twp: Footage: 1090 FSL  1996 FEL
Proposed Depth/Form:5749 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-14 , Unit Acreage: 40, Drill Unit: SW4SE4
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.

Wellbore Completed
Completion Date:6/21/2006
Spud Date:6/15/2006Spud Date Is:ACTUAL
Measured TD:5735 ft.Measured PB depth:5701 ft.
True Vertical TD:5730 ft.True Vertical PB depth:
Top PZ Location:Sec:14 Twp: 7S 96WFootage: 1110 FSL  1988 FEL
Bottom Hole Location:Sec:14 Twp: 7S 96WFootage: 1110 FSL  1988 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1133 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1133 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5726 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 785, Top: 2402 ft., Bottom: 5726 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G946 ft.NN
FORT UNION1353 ft.NN
MESAVERDE2723 ft.NN
CAMEO5130 ft.NN
ROLLINS5593 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/10/2006                 Interval Top: 3978 ft.    Interval Bottom: 5538 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/28/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/27/2006
Treatment Summary:3078 GALS 7 1/2% HCL; 822500# 30/50 SAND; 18575 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:4816 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/10/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1323
MCF_GAS 1136
TUBING_PRESS 1272
Perforation Data:
Interval Top:3978 ft.# Of Holes:111
Interval Bottom:5538 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)16233
GOR773000
GOR DeterminationMCFE
Average BOE per Day7.719
Average MCFE per Day44.793

 Federal Financial Assurance  i 

 Tribal Well  i No