Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10825
Well Classification: GW Status: PR - 1/6/2006
Well Name/No:FEDERAL #PA 14-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date1/6/2006
FacilityID:278044LocationID:335230
County:GARFIELD #045Location:SESW 21 6S95W 6
Field:PARACHUTE - #67350Elevation:5717 ft.
Basin:PICEANCE BASIN  
Planned Location:980FSL  1802 FWLLat/Long: 39.505139 / -108.006783Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.505189 / -108.006729Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/6/2006             Measured TD: 8120 ft.    Vertical TD: 8035 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/6/2006
Wellbore PermitDIRECTIONAL
Permit #:20051578 Expiration Date:6/2/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1332 FSL  903 FWL
Bottom Hole Location:Sec: Twp: Footage: 1332 FSL  903 FWL
Proposed Depth/Form:8199 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: , Drill Unit: UNSPAC

Wellbore Completed
Completion Date:9/9/2005
Spud Date:8/31/2005Spud Date Is:ACTUAL
Measured TD:8120 ft.Measured PB depth:8073 ft.
True Vertical TD:8035 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1332 FSL  903 FWL
Bottom Hole Location:Sec: Twp: Footage: 1332 FSL  903 FWL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE, MUD LOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 921 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 921 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8119 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 865, Top: 3350 ft., Bottom: 8119 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT UNION2762 ft.NN
MESAVERDE4658 ft.NN
CAMEO7335 ft.NN
ROLLINS8088 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/6/2006                  Interval Top: 5862 ft.    Interval Bottom: 7981 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/9/2005
Treatment Summary:3250 GALS 10% ACETIC ACID; 1500 GALS 7.5% HCL; 838,067# 30/50 SAND; 19,923 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7517 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/27/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1171
CASING_PRESS 1585
MCF_GAS 1171
TUBING_PRESS 1420
Perforation Data:
Interval Top:5862 ft.# Of Holes:138
Interval Bottom:7981 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)16
Total Gas Produced (MCF)12268
GOR766750
GOR DeterminationMCFE
Average BOE per Day5.839
Average MCFE per Day33.880

 Federal Financial Assurance  i Y

 Tribal Well  i No