Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10785
Well Classification: GW Status: PR - 1/17/2010
Well Name/No:DAYBREAK FEDERAL #30-10BB PG30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC0128381
Facility Status:PRStatus Date1/17/2010
FacilityID:277809LocationID:334657
County:GARFIELD #045Location:SWNE 30 7S95W 6
Field:PARACHUTE - #67350Elevation:6242 ft.
Basin:PICEANCE BASIN  
Planned Location:2120FNL  1892 FELLat/Long: 39.409870 / -108.036910Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.409880 / -108.036920Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/17/2010             Measured TD: 6990 ft.    Vertical TD: 6937 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/17/2010
Wellbore PermitDIRECTIONAL
Permit #:20088672 Expiration Date:4/22/2010
Proposed Top PZ Location:Sec: Twp: Footage: 2440 FSL  1980 FEL
Bottom Hole Location:Sec:30 Twp: 7S 95W Footage: 2440 FSL  1980 FEL
Proposed Depth/Form:7118 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-44 , Unit Acreage: 20, Drill Unit: SWNE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 40 ft., Weight: 0 , Citings Type: PLANNED
Cement:Sacks: 5, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1500 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 790, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 7680 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 860, Top: 500 ft., Bottom: 7680 ft.

Wellbore Completed
Completion Date:5/27/2009
Spud Date:5/21/2009Spud Date Is:ACTUAL
Measured TD:6990 ft.Measured PB depth:6909 ft.
True Vertical TD:6937 ft.True Vertical PB depth:6856 ft.
Top PZ Location:Sec:30 Twp: 7S 95WFootage: 2459 FSL  1974 FEL
Bottom Hole Location:Sec:30 Twp: 7S 95WFootage: 2422 FSL  1990 FEL
Log Types:CBL, RST
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 46 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 46 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1014 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 467, Top: 0 ft., Bottom: 1030 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6977 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 3250 ft., Bottom: 6977 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.3841 ft.
OHIO CREEK3842 ft.4333 ft.
WILLIAMS FORK4334 ft.6664 ft.
ROLLINS6665 ft.6990 ft.

Formation WMFK                     Formation Classification:  OW                     Status:  PR - 1/17/2010                 Interval Top: 4918 ft.    Interval Bottom: 6629 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/16/2010Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/15/2009
Treatment Summary:STAGES 01-07 TREATED WITH A TOTAL OF: 47701.6 BBLS OF SLICKWATER, 667100 LBS 20/40 WHITE SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6005 ft.
Tubing Packer Depth:0 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/17/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 32
BBLS_OIL 0
BTU_GAS 1170
CALC_BBLS_H2O 32
CALC_GOR 0
CALC_MCF_GAS 1197
CASING_PRESS 1325
MCF_GAS 1197
TUBING_PRESS 475
Perforation Data:
Interval Top:4918 ft.# Of Holes:189
Interval Bottom:6629 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)17194
GOR818761
GOR DeterminationMCFE
Average BOE per Day8.184
Average MCFE per Day47.474

 Federal Financial Assurance  i Y

 Tribal Well  i No