Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10753
Well Classification: GW Status: PR - 11/28/2012
Well Name/No:FEDERAL #29-3 (PF29)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 01523
Facility Status:PRStatus Date11/28/2012
FacilityID:277694LocationID:334681
County:GARFIELD #045Location:SENW 29 7S95W 6
Field:PARACHUTE - #67350Elevation:6036 ft.
Basin:PICEANCE BASIN  
Planned Location:1871FNL  1545 FWLLat/Long: 39.410520 / -108.024643Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.410530 / -108.024750Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/28/2012             Measured TD: 7773 ft.    Vertical TD: 7518 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/28/2012
Wellbore PermitDIRECTIONAL
Permit #:20051491 Expiration Date:5/15/2006
Proposed Top PZ Location:Sec: Twp: Footage: 490 FNL  1980 FWL
Bottom Hole Location:Sec:29 Twp: Footage: 490 FNL  1980 FWL
Proposed Depth/Form:7669 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 139-48 , Unit Acreage: 640, Drill Unit: ALL
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-31 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:8/21/2005
Spud Date:5/19/2005Spud Date Is:ACTUAL
Measured TD:7773 ft.Measured PB depth:7179 ft.
True Vertical TD:7518 ft.True Vertical PB depth:
Top PZ Location:Sec:29 Twp: 7S 95WFootage: 481 FNL  1990 FWL
Bottom Hole Location:Sec:29 Twp: 7S 95WFootage: 481 FNL  1990 FWL
Log Types:PEX/GR,CBL/GR/TEMP
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1510 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1075, Top: 0 ft., Bottom: 1510 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7763 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1725, Top: 40 ft., Bottom: 7763 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.NN
WILLIAMS FORK4315 ft.NN
ROLLINS6865 ft.NN
COZZETTE7163 ft.NN
CORCORAN7415 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 11/28/2012                Interval Top: 5015 ft.    Interval Bottom: 6812 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:11/2/2005Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:11/9/2012Treatment End Date:11/9/2012
Treatment Summary:DRILLED OUT CBP @ 4910, TUBING WAS LANDED AND THE WELL RETURNED TO PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/10/2012
Treatment Summary:CBP SET AT 4910', TESTED TO 1500 PSI
Formation Treatment
Treatment Date:10/26/2005
Treatment Summary:STAGES 1 - 6 WERE TREATED WITH A TOTAL OF 22,901 BBLS OF SLICKWATER AND 852,046 OF 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6000 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 39
BBLS_OIL 0
BTU_GAS 1170
CALC_BBLS_H2O 39
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
CASING_PRESS 110
MCF_GAS 0
TUBING_PRESS 80
Perforation Data:
Interval Top:5015 ft.# Of Holes:110
Interval Bottom:6812 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)14
Total Gas Produced (MCF)6066
GOR433285
GOR DeterminationMCFE
Average BOE per Day2.909
Average MCFE per Day16.855

 Federal Financial Assurance  i Y

 Tribal Well  i No