Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10681
Well Classification: GW Status: PR - 10/28/2005
Well Name/No:ANCHONDO #32B-20-692
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/28/2005
FacilityID:277338LocationID:335119
County:GARFIELD #045Location:SENE 20 6S92W 6
Field:MAMM CREEK - #52500Elevation:5655 ft.
Basin:PICEANCE BASIN  
Planned Location:1799FNL  1199 FELLat/Long: 39.514470 / -107.685354Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.514520 / -107.685385Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/28/2005             Measured TD: 7625 ft.    Vertical TD: 7537 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/28/2005
Wellbore PermitDIRECTIONAL
Permit #:20051060 Expiration Date:4/21/2006
Proposed Top PZ Location:Sec:20 Twp: 6S 92W Footage: 2155 FNL  1980 FEL
Bottom Hole Location:Sec:20 Twp: 6S 92W Footage: 2155 FNL  1980 FEL
Proposed Depth/Form:8485 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 191-8 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:8/23/2005
Spud Date:7/4/2005Spud Date Is:ACTUAL
Measured TD:7625 ft.Measured PB depth:7577 ft.
True Vertical TD:7537 ft.True Vertical PB depth:7489 ft.
Top PZ Location:Sec:20 Twp: 6S 92WFootage: 2155 FNL  1980 FEL
Bottom Hole Location:Sec:20 Twp: 6S 92WFootage: 2155 FNL  1980 FEL
Log Types:PLATFORM EXPRESS/ARRAY INDUCTION/GR/CBL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 804 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 804 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7620 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1265, Top: 3700 ft., Bottom: 7620 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK3694 ft.NN
ROLLINS7383 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 10/28/2005                Interval Top: 5580 ft.    Interval Bottom: 7348 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.000 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/23/2005
Treatment Summary:30,156 BBLS. SLICKWATER, 1,238,000 LBS. 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:5553 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/24/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_GOR 2016
CALC_MCF_GAS 2016
CASING_PRESS 1150
MCF_GAS 2016
Perforation Data:
Interval Top:5580 ft.# Of Holes:194
Interval Bottom:7348 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)55
Total Gas Produced (MCF)10403
GOR189145
GOR DeterminationMCFE
Average BOE per Day5.065
Average MCFE per Day29.387

 Federal Financial Assurance  i 

 Tribal Well  i No