|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/1/2006 Measured TD: 8967 ft. Vertical TD: 8951 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/1/2006 | | Wellbore Permit | | | Permit #: | 20051036 | Expiration Date: | 4/20/2006 | | Proposed Depth/Form: | 9052 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 8/12/2005 | | Spud Date: | 7/22/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 8967 ft. | Measured PB depth: | 8911 ft. | | True Vertical TD: | 8951 ft. | True Vertical PB depth: | | | Log Types: | CBL; RESERVOIR MONITOR TOOL ELITE; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 8.625 in., Top: 0 ft., Depth: 2740 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1480, Top: 0 ft., Bottom: 2740 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8953 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 750, Top: 5790 ft., Bottom: 8953 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4473 ft. | | N | N | | FORT UNION | 4732 ft. | | N | N | | MESAVERDE | 6130 ft. | | N | N | | CAMEO | 8487 ft. | | N | N | | ROLLINS | 8927 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 1/1/2006 Interval Top: 7050 ft. Interval Bottom: 8797 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.281 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/12/2005 | | Treatment Summary: | 5,250 GALS 7.5% HCL; 741,400# 20/40 SAND; 18,068 BBLS SLICK WATER |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8281 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/1/2006 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 586 | | CASING_PRESS | 907 | | TUBING_PRESS | 670 |
| | Perforation Data: | | Interval Top: | 7050 ft. | # Of Holes: | 138 | | Interval Bottom: | 8797 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 55 |
| Total Gas Produced (MCF) | 21306 |
| GOR | 387381 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.219 |
| Average MCFE per Day | 59.263 |
| Federal Financial Assurance | i | |
|
|