|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/17/2005 Measured TD: 8931 ft. Vertical TD: 8931 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/17/2005 | | Wellbore Permit | | | Permit #: | 20051035 | Expiration Date: | 4/20/2006 | | Proposed Depth/Form: | 8901 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 7/17/2005 | | Spud Date: | 6/30/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 8931 ft. | Measured PB depth: | 8716 ft. | | True Vertical TD: | 8931 ft. | True Vertical PB depth: | | | Log Types: | RESERVOIR MONITOR TOOL ELITE, CBL | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2617 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1604, Top: 0 ft., Bottom: 2617 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8885 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1000, Top: 4860 ft., Bottom: 8885 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FORT UNION | 4486 ft. | | N | N | | MESAVERDE | 5903 ft. | | N | N | | CAMEO | 8301 ft. | | N | N | | ROLLINS | 8732 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 8/17/2005 Interval Top: 6779 ft. Interval Bottom: 8667 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.500 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/17/2005 | | Treatment Summary: | COBRAMAX TREATMENT - 4650 GAL 7.5% HCL, FRAC IN 15 TOTAL STAGE WITH 15,824 BBLS SLICK WATER, 625,090 LBS 20/40 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8448 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/19/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 375 | | CASING_PRESS | 1565 | | TUBING_PRESS | 1444 |
| | Perforation Data: | | Interval Top: | 6779 ft. | # Of Holes: | 124 | | Interval Bottom: | 8667 ft. | Hole Size: | 0.75 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 17 |
| Total Gas Produced (MCF) | 8540 |
| GOR | 502352 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.085 |
| Average MCFE per Day | 23.674 |
| Federal Financial Assurance | i | |
|
|