Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10656
Well Classification: GW Status: PR - 1/23/2006
Well Name/No:CHEVRON #GM 444-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/23/2006
FacilityID:277261LocationID:335419
County:GARFIELD #045Location:SESE 20 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5518 ft.
Basin:PICEANCE BASIN  
Planned Location:1044FSL  602 FELLat/Long: 39.505388 / -108.125457Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.505337 / -108.125259Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/23/2006             Measured TD: 6895 ft.    Vertical TD: 6880 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/23/2006
Wellbore PermitDIRECTIONAL
Permit #:20051014 Expiration Date:4/20/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1247 FSL  417 FEL
Bottom Hole Location:Sec: Twp: Footage: 1247 FSL  417 FEL
Proposed Depth/Form:6876 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:11/10/2005
Spud Date:10/30/2005Spud Date Is:ACTUAL
Measured TD:6895 ft.Measured PB depth:6793 ft.
True Vertical TD:6880 ft.True Vertical PB depth:
Top PZ Location:Sec:20 Twp: 6S 96WFootage: 1361 FSL  409 FEL
Bottom Hole Location:Sec:20 Twp: 6S 96WFootage: 1361 FSL  409 FEL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1132 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1132 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6864 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 828, Top: 4140 ft., Bottom: 6864 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2005 ft.NN
FORT UNION2312 ft.NN
MESAVERDE3747 ft.NN
CAMEO6216 ft.NN
ROLLINS6737 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/23/2006                 Interval Top: 4926 ft.    Interval Bottom: 6683 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/9/2005Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/3/2005
Treatment Summary:12/3/05 750 GALS 10% ACETIC ACID; 3504 GALS 7 1/2%HCL; 686,500# 30/50 SAND; 17031 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5959 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/23/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_MCF_GAS 1234
CASING_PRESS 1654
TUBING_PRESS 1526
Perforation Data:
Interval Top:4926 ft.# Of Holes:110
Interval Bottom:6683 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)25
Total Gas Produced (MCF)14241
GOR569640
GOR DeterminationMCFE
Average BOE per Day6.796
Average MCFE per Day39.414

 Federal Financial Assurance  i 

 Tribal Well  i No