Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10574
Well Classification: OW Status: PR - 9/21/2005
Well Name/No:FEDERAL #RWF 324-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/21/2005
FacilityID:276958LocationID:335396
County:GARFIELD #045Location:SESW 19 6S94W 6
Field:RULISON - #75400Elevation:5621 ft.
Basin:PICEANCE BASIN  
Planned Location:640FSL  1522 FWLLat/Long: 39.504899 / -107.932871Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.504964 / -107.932845Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/21/2005             Measured TD: 7985 ft.    Vertical TD: 7701 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/21/2005
Wellbore PermitDIRECTIONAL
Permit #:20050793 Expiration Date:4/5/2006
Proposed Top PZ Location:Sec: Twp: Footage: 248 FSL  1594 FWL
Bottom Hole Location:Sec: Twp: Footage: 248 FSL  1594 FWL
Proposed Depth/Form:8010 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:8/20/2005
Spud Date:5/29/2005Spud Date Is:ACTUAL
Measured TD:7985 ft.Measured PB depth:7951 ft.
True Vertical TD:7701 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 248 FSL  1594 FWL
Bottom Hole Location:Sec: Twp: Footage: 248 FSL  1594 FWL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1129 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1129 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7958 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 5400 ft., Bottom: 7958 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2296 ft.NN
MESAVERDE4654 ft.NN
CAMEO7195 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 9/21/2005                 Interval Top: 5796 ft.    Interval Bottom: 7815 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/20/2005
Treatment Summary:2000 GALS 7 1/2% HCL, 1250 GALS 10% ACETIC, 540900# 20/40, 13286 SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7399 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/21/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1553
CASING_PRESS 1526
TUBING_PRESS 1449
Perforation Data:
Interval Top:5796 ft.# Of Holes:101
Interval Bottom:7815 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)56
Total Gas Produced (MCF)14219
GOR253910
GOR DeterminationMCFE
Average BOE per Day6.872
Average MCFE per Day39.846

 Federal Financial Assurance  i Y

 Tribal Well  i No