Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10570
Well Classification: GW Status: PR - 5/16/2006
Well Name/No:FEDERAL #RWF 322-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/16/2006
FacilityID:276969LocationID:335432
County:GARFIELD #045Location:NWSW 19 6S94W 6
Field:RULISON - #75400Elevation:5818 ft.
Basin:PICEANCE BASIN  
Planned Location:2587FSL  156 FWLLat/Long: 39.510199 / -107.937691Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.510221 / -107.937654Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/16/2006             Measured TD: 8570 ft.    Vertical TD: 8259 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/16/2006
Wellbore PermitDIRECTIONAL
Permit #:20050745 Expiration Date:4/5/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1666 FNL  1614 FWL
Bottom Hole Location:Sec: Twp: Footage: 1666 FNL  1614 FWL
Proposed Depth/Form:8554 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:11/27/2005
Spud Date:11/9/2005Spud Date Is:ACTUAL
Measured TD:8570 ft.Measured PB depth:8506 ft.
True Vertical TD:8259 ft.True Vertical PB depth:
Top PZ Location:Sec:19 Twp: 6S 94WFootage: 1640 FNL  1614 FWL
Bottom Hole Location:Sec:19 Twp: 6S 94WFootage: 1640 FNL  1614 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2870 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 735, Top: 0 ft., Bottom: 2870 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8559 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 4090 ft., Bottom: 8559 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2640 ft.NN
MESAVERDE5159 ft.NN
CAMEO7769 ft.NN
ROLLINS8530 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/16/2006                 Interval Top: 6364 ft.    Interval Bottom: 8369 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/7/2006Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/6/2006
Treatment Summary:4,133 GALS 7.5% HCL; 760,900# 20/40 SAND; 18,058 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:8099 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/16/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1585
CASING_PRESS 2306
MCF_GAS 1585
TUBING_PRESS 2207
Perforation Data:
Interval Top:6364 ft.# Of Holes:138
Interval Bottom:8369 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)39
Total Gas Produced (MCF)17970
GOR460769
GOR DeterminationMCFE
Average BOE per Day8.595
Average MCFE per Day49.848

 Federal Financial Assurance  i Y

 Tribal Well  i No