Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10527
Well Classification: GW Status: PR - 10/13/2005
Well Name/No:FEDERAL #GM 324-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date10/13/2005
FacilityID:276798LocationID:334817
County:GARFIELD #045Location:SESW 3 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5894 ft.
Basin:PICEANCE BASIN  
Planned Location:835FSL  1709 FWLLat/Long: 39.460989 / -108.099356Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.461054 / -108.099343Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/13/2005             Measured TD: 6715 ft.    Vertical TD: 6685 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/13/2005
Wellbore PermitDIRECTIONAL
Permit #:20050655 Expiration Date:3/24/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1265 FSL  1928 FWL
Bottom Hole Location:Sec: Twp: Footage: 1265 FSL  1928 FWL
Proposed Depth/Form:6753 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:8/20/2005
Spud Date:7/15/2005Spud Date Is:ACTUAL
Measured TD:6715 ft.Measured PB depth:6671 ft.
True Vertical TD:6685 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1265 FSL  1928 FWL
Bottom Hole Location:Sec: Twp: Footage: 1265 FSL  1928 FWL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1128 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1128 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6700 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 773, Top: 3100 ft., Bottom: 6700 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1970 ft.NN
FORT UNION2278 ft.NN
MESAVERDE3660 ft.NN
CAMEO6117 ft.NN
ROLLINS6598 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/13/2005                Interval Top: 4832 ft.    Interval Bottom: 6459 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/20/2005
Treatment Summary:3750 GALS 7 1/2% HCL, 750 GALS 10% ACETIC, 741100# 30/50, 17006 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:5990 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/13/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1248
CASING_PRESS 1115
TUBING_PRESS 1024
Perforation Data:
Interval Top:4832 ft.# Of Holes:109
Interval Bottom:6459 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)9896
GOR899636
GOR DeterminationMCFE
Average BOE per Day4.707
Average MCFE per Day27.295

 Federal Financial Assurance  i Y

 Tribal Well  i No