Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10484
Well Classification: GW Status: PR - 8/29/2005
Well Name/No:WILLIAMS #GM 511-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/29/2005
FacilityID:276584LocationID:334897
County:GARFIELD #045Location:NWNW 1 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5512 ft.
Basin:PICEANCE BASIN  
Planned Location:900FNL  1156 FWLLat/Long: 39.470919 / -108.062815Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.470807 / -108.062882Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/29/2005             Measured TD: 6798 ft.    Vertical TD: 6760 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/29/2005
Wellbore PermitDIRECTIONAL
Permit #:20050476 Expiration Date:3/14/2006
Proposed Top PZ Location:Sec: Twp: Footage: 766 FNL  591 FWL
Bottom Hole Location:Sec: Twp: Footage: 766 FNL  591 FWL
Proposed Depth/Form:6875 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38,440, Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:6/21/2005
Spud Date:5/19/2005Spud Date Is:ACTUAL
Measured TD:6798 ft.Measured PB depth:6730 ft.
True Vertical TD:6760 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 766 FNL  591 FWL
Bottom Hole Location:Sec: Twp: Footage: 766 FNL  591 FWL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1118 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1118 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6787 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 2690 ft., Bottom: 6787 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1859 ft.NN
FORT UNION2151 ft.NN
MESAVERDE3690 ft.NN
CAMEO6208 ft.NN
ROLLINS6725 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/29/2005                 Interval Top: 5070 ft.    Interval Bottom: 6531 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/21/2005
Treatment Summary:3000 GALS 7 1/2% HCL, 527560# 20/40, 12565 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6201 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/19/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1330
CASING_PRESS 1399
MCF_GAS 1330
TUBING_PRESS 1337
Perforation Data:
Interval Top:5070 ft.# Of Holes:86
Interval Bottom:6531 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)14
Total Gas Produced (MCF)11046
GOR789000
GOR DeterminationMCFE
Average BOE per Day5.258
Average MCFE per Day30.514

 Federal Financial Assurance  i 

 Tribal Well  i No