Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10481
Well Classification: GW Status: PR - 3/13/2006
Well Name/No:PA #424-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/13/2006
FacilityID:276497LocationID:334749
County:GARFIELD #045Location:SESW 32 6S95W 6
Field:PARACHUTE - #67350Elevation:5155 ft.
Basin:PICEANCE BASIN  
Planned Location:1052FSL  2138 FWLLat/Long: 39.476738 / -108.023522Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.476760 / -108.023540Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/13/2006             Measured TD: 6545 ft.    Vertical TD: 6520 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/13/2006
Wellbore PermitDIRECTIONAL
Permit #:20050461 Expiration Date:3/9/2006
Proposed Top PZ Location:Sec: Twp: Footage: 741 FSL  1927 SWL
Bottom Hole Location:Sec: Twp: Footage: 741 FSL  1927 FWL
Proposed Depth/Form:6631 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:1/29/2006
Spud Date:1/17/2006Spud Date Is:ACTUAL
Measured TD:6545 ft.Measured PB depth:6450 ft.
True Vertical TD:6520 ft.True Vertical PB depth:
Top PZ Location:Sec:32 Twp: 6S 95WFootage: 761 FSL  1936 FWL
Bottom Hole Location:Sec:32 Twp: 6S 95WFootage: 761 FSL  1936 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1539 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 417, Top: 0 ft., Bottom: 1539 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6522 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 885, Top: 1760 ft., Bottom: 6522 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1309 ft.NN
FORT UNION1669 ft.NN
MESAVERDE3359 ft.NN
CAMEO5827 ft.NN
ROLLINS6497 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/13/2006                 Interval Top: 4479 ft.    Interval Bottom: 6333 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/22/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/21/2006
Treatment Summary:3590 GALS 7.5% HCL; 729100# 30/50 SAND; 17273 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5971 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/13/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1315
CASING_PRESS 1730
TUBING_PRESS 1552
Perforation Data:
Interval Top:4479 ft.# Of Holes:125
Interval Bottom:6333 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)22
Total Gas Produced (MCF)13157
GOR598045
GOR DeterminationMCFE
Average BOE per Day6.279
Average MCFE per Day36.419

 Federal Financial Assurance  i 

 Tribal Well  i No