Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10415
Well Classification: GW Status: PR - 8/1/2020
Well Name/No:DAY BREAK #36-1BB (PA36)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2020
FacilityID:276069LocationID:334089
County:GARFIELD #045Location:NENE 36 7S96W 6
Field:PARACHUTE - #67350Elevation:6162 ft.
Basin:PICEANCE BASIN  
Planned Location:480FNL  518 FELLat/Long: 39.400100 / -108.050454Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.400170 / -108.050390Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2020             Measured TD: 6375 ft.    Vertical TD: 6298 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2020
Wellbore PermitDIRECTIONAL
Permit #:20050317 Expiration Date:2/15/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1175 FNL  660 FEL
Bottom Hole Location:Sec:36 Twp: Footage: 1175 FNL  660 FEL
Proposed Depth/Form:6378 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-44 , Unit Acreage: 640, Drill Unit: NE4

Wellbore Completed
Completion Date:2/8/2006
Spud Date:11/27/2005Spud Date Is:ACTUAL
Measured TD:6375 ft.Measured PB depth:6330 ft.
True Vertical TD:6298 ft.True Vertical PB depth:
Top PZ Location:Sec:36 Twp: 7S 96WFootage: 1140 FNL  651 FEL
Bottom Hole Location:Sec:36 Twp: 7S 96WFootage: 1140 FNL  651 FEL
Log Types:RST/GR/CCL; CBL/TEMP/GR/CCL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1554 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 1554 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6375 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 485, Top: 3650 ft., Bottom: 6375 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.4019 ft.NN
WILLIAMS FORK4020 ft.6375 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 8/1/2020                  Interval Top: 4590 ft.    Interval Bottom: 6170 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:4/20/2006Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/17/2006
Treatment Summary:STAGES 1 THROUGH 5 WERE TREATED WITH A TOTAL OF 22,785 BBLS OF SLICKWATER AND 806,111 LBS 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:5605 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/12/2006Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 447
BBLS_OIL 1
BTU_GAS 1170
CALC_BBLS_H2O 447
CALC_BBLS_OIL 1
CALC_GOR 664000
CALC_MCF_GAS 664
CASING_PRESS 1165
MCF_GAS 664
TUBING_PRESS 675
Perforation Data:
Interval Top:4590 ft.# Of Holes:110
Interval Bottom:6170 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)19597
GOR979850
GOR DeterminationMCFE
Average BOE per Day9.282
Average MCFE per Day53.863

 Federal Financial Assurance  i Y

 Tribal Well  i No