Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10369
Well Classification: GW Status: PR - 7/27/2005
Well Name/No:CLOUGH #RWF 433-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/27/2005
FacilityID:275672LocationID:335639
County:GARFIELD #045Location:NWSE 10 6S94W 6
Field:RULISON - #75400Elevation:5673 ft.
Basin:PICEANCE BASIN  
Planned Location:2032FSL  1842 FELLat/Long: 39.537899 / -107.871410Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.538081 / -107.871284Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/27/2005             Measured TD: 8655 ft.    Vertical TD: 8651 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/27/2005
Wellbore PermitDIRECTIONAL
Permit #:20043269 Expiration Date:1/20/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2081 FSL  2033 FEL
Bottom Hole Location:Sec: Twp: Footage: 2081 FSL  2033 FEL
Proposed Depth/Form:8653 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:5/4/2005
Spud Date:3/25/2005Spud Date Is:ACTUAL
Measured TD:8655 ft.Measured PB depth:8559 ft.
True Vertical TD:8651 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2081 FSL  2033 FEL
Bottom Hole Location:Sec: Twp: Footage: 2081 FSL  2033 FEL
Log Types:HIGH RESOLUTION ARRAY INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1090 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1090 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8642 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1100, Top: 4472 ft., Bottom: 8643 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2251 ft.NN
MESAVERDE4795 ft.NN
CAMEO7572 ft.NN
ROLLINS8525 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/27/2005                 Interval Top: 5120 ft.    Interval Bottom: 8471 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.234 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/4/2005
Treatment Summary:4750 GAL 7 1/2% HCL, 719100# 20/40,16257 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7523 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/6/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1125
CASING_PRESS 1542
MCF_GAS 1125
TUBING_PRESS 1412
Perforation Data:
Interval Top:5120 ft.# Of Holes:110
Interval Bottom:8471 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)109
Total Gas Produced (MCF)24061
GOR220743
GOR DeterminationMCFE
Average BOE per Day11.667
Average MCFE per Day67.654

 Federal Financial Assurance  i 

 Tribal Well  i No