Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10325
Well Classification: GW Status: PR - 10/30/2005
Well Name/No:FEDERAL #PA 532-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62740
Facility Status:PRStatus Date10/30/2005
FacilityID:275480LocationID:335246
County:GARFIELD #045Location:SWNE 32 6S95W 6
Field:PARACHUTE - #67350Elevation:5244 ft.
Basin:PICEANCE BASIN  
Planned Location:1710FNL  2114 FELLat/Long: 39.483579 / -108.020024Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.483576 / -108.019999Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/30/2005             Measured TD: 6914 ft.    Vertical TD: 6901 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/30/2005
Wellbore PermitDIRECTIONAL
Permit #:20043141 Expiration Date:1/3/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1514 FNL  2092 FEL
Bottom Hole Location:Sec: Twp: Footage: 1514 FNL  2092 FEL
Proposed Depth/Form:6894 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:9/16/2005
Spud Date:7/21/2005Spud Date Is:ACTUAL
Measured TD:6914 ft.Measured PB depth:6830 ft.
True Vertical TD:6901 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1514 FNL  2092 FEL
Bottom Hole Location:Sec: Twp: Footage: 1514 FNL  2092 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1727 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 475, Top: 0 ft., Bottom: 1726 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6913 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 2400 ft., Bottom: 6913 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND1398 ft.NN
FORT UNION1744 ft.NN
MESAVERDE3482 ft.NN
CAMEO6042 ft.NN
ROLLINS6844 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/30/2005                Interval Top: 4755 ft.    Interval Bottom: 6730 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/16/2005
Treatment Summary:4000 GALS 10% ACETIC ACID, 679,400# 30/50 SAND, 15,798 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6421 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/2005Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1010
CASING_PRESS 1100
TUBING_PRESS 978
Perforation Data:
Interval Top:4755 ft.# Of Holes:106
Interval Bottom:6730 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)16
Total Gas Produced (MCF)8524
GOR532750
GOR DeterminationMCFE
Average BOE per Day4.068
Average MCFE per Day23.617

 Federal Financial Assurance  i Y

 Tribal Well  i No