Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10298
Well Classification: GW Status: PR - 7/1/2021
Well Name/No:CHEVRON #GM 412-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2021
FacilityID:273939LocationID:335426
County:GARFIELD #045Location:SWNW 20 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5748 ft.
Basin:PICEANCE BASIN  
Planned Location:1922FNL  691 FWLLat/Long: 39.511658 / -108.139528Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.511799 / -108.139426Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2021             Measured TD: 7041 ft.    Vertical TD: 7027 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20042163 Expiration Date:9/30/2005
Proposed Top PZ Location:Sec: Twp: Footage: 2134 FNL  707 FWL
Bottom Hole Location:Sec: Twp: Footage: 2134 FNL  707 FWL
Proposed Depth/Form:7036 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:3/5/2005
Spud Date:12/2/2004Spud Date Is:ACTUAL
Measured TD:7041 ft.Measured PB depth:6971 ft.
True Vertical TD:7027 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2134 FNL  707 FWL
Bottom Hole Location:Sec: Twp: Footage: 2134 FNL  707 FWL
Log Types:HIGH DEFINITION INDUCTION COMPENSATED Z-DENSILOG COMPENSATED NEUTRON GR, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1119 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 1119 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7000 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 745, Top: 2870 ft., Bottom: 7000 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2157 ft.NN
FORT UNION2490 ft.NN
MESAVERDE3840 ft.NN
CAMEO6404 ft.NN
ROLLINS6879 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/1/2021                  Interval Top: 5210 ft.    Interval Bottom: 6860 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/5/2005
Treatment Summary:3250 GALS 7 1/2% HCL, 424800# 30/50, 9642 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6516 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/20/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 1353
CASING_PRESS 813
TUBING_PRESS 660
Perforation Data:
Interval Top:5210 ft.# Of Holes:74
Interval Bottom:6860 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)15
Total Gas Produced (MCF)12438
GOR829200
GOR DeterminationMCFE
Average BOE per Day5.916
Average MCFE per Day34.329

 Federal Financial Assurance  i 

 Tribal Well  i No