Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10239
Well Classification: GW Status: PR - 12/31/2004
Well Name/No:PA #21-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62162
Facility Status:PRStatus Date12/31/2004
FacilityID:273335LocationID:334628
County:GARFIELD #045Location:NENW 6 7S95W 6
Field:PARACHUTE - #67350Elevation:5403 ft.
Basin:PICEANCE BASIN  
Planned Location:735FNL  1448 FWLLat/Long: 39.472149 / -108.043734Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.472064 / -108.043779Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/31/2004             Measured TD: 6780 ft.    Vertical TD: 6730 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/31/2004
Wellbore PermitDIRECTIONAL
Permit #:20041787 Expiration Date:8/11/2005
Proposed Top PZ Location:Sec: Twp: Footage: 218 FNL  1835 FWL
Bottom Hole Location:Sec: Twp: Footage: 218 FNL  1835 FWL
Proposed Depth/Form:6939 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 160, Drill Unit: NW4

Wellbore Completed
Completion Date:11/20/2004
Spud Date:9/29/2004Spud Date Is:ACTUAL
Measured TD:6780 ft.Measured PB depth:6755 ft.
True Vertical TD:6730 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 218 FNL  1835 FWL
Bottom Hole Location:Sec: Twp: Footage: 218 FNL  1835 FWL
Log Types:HIG DEFINITION INDUCTION COMP.Z-DENSILOG COMP. NEU,GR,CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1120 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1120 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6779 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 2700 ft., Bottom: 6779 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1700 ft.NN
FORT UNION1986 ft.NN
MESAVERDE3715 ft.NN
CAMEO6259 ft.NN
ROLLINS6788 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/31/2004                Interval Top: 4810 ft.    Interval Bottom: 6705 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/20/2004
Treatment Summary:4000 GALS 7-1/2% HCL, 553835# 30/50, 13524 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6342 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/31/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1422
CASING_PRESS 1650
MCF_GAS 1422
TUBING_PRESS 1580
Perforation Data:
Interval Top:4810 ft.# Of Holes:93
Interval Bottom:6705 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)15565
GOR648541
GOR DeterminationMCFE
Average BOE per Day7.417
Average MCFE per Day43.039

 Federal Financial Assurance  i 

 Tribal Well  i No