Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10238
Well Classification: GW Status: PR - 12/1/2018
Well Name/No:FEDERAL #RWF 434-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 60132
Facility Status:PRStatus Date12/1/2018
FacilityID:273336LocationID:335382
County:GARFIELD #045Location:SWSE 19 6S94W 6
Field:RULISON - #75400Elevation:5536 ft.
Basin:PICEANCE BASIN  
Planned Location:569FSL  2189 FELLat/Long: 39.504749 / -107.928881Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.504810 / -107.928856Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2018             Measured TD: 8000 ft.    Vertical TD: 7987 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2018
Wellbore PermitDIRECTIONAL
Permit #:20041754 Expiration Date:8/11/2005
Proposed Top PZ Location:Sec: Twp: Footage: 829 FSL  1980 FEL
Bottom Hole Location:Sec: Twp: Footage: 829 FSL  1980 FEL
Proposed Depth/Form:8092 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:1/31/2005
Spud Date:10/26/2004Spud Date Is:ACTUAL
Measured TD:8000 ft.Measured PB depth:7973 ft.
True Vertical TD:7987 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 829 FSL  1980 FEL
Bottom Hole Location:Sec: Twp: Footage: 829 FSL  1980 FEL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1111 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1111 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7971 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1025, Top: 3900 ft., Bottom: 7971 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2204 ft.NN
MESAVERDE4536 ft.NN
CAMEO7139 ft.NN
ROLLINS8020 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/1/2018                 Interval Top: 5705 ft.    Interval Bottom: 7861 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/31/2005
Treatment Summary:4750 GALS 7 1/2% HCL, 599200# 20/40,15108 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6981 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/2/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1660
CASING_PRESS 1662
MCF_GAS 1660
TUBING_PRESS 1537
Perforation Data:
Interval Top:5705 ft.# Of Holes:110
Interval Bottom:7861 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)18
Total Gas Produced (MCF)13768
GOR764888
GOR DeterminationMCFE
Average BOE per Day6.548
Average MCFE per Day37.982

 Federal Financial Assurance  i Y

 Tribal Well  i No