Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10222
Well Classification: GW Status: PR - 3/25/2005
Well Name/No:FEDERAL #GM 422-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 34553A
Facility Status:PRStatus Date3/25/2005
FacilityID:273258LocationID:334882
County:GARFIELD #045Location:SENW 3 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5593 ft.
Basin:PICEANCE BASIN  
Planned Location:1702FNL  1683 FWLLat/Long: 39.468549 / -108.098496Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.468610 / -108.098423Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/25/2005             Measured TD: 6596 ft.    Vertical TD: 6570 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/25/2005
Wellbore PermitDIRECTIONAL
Permit #:20041613 Expiration Date:8/1/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1991 FNL  2050 FWL
Bottom Hole Location:Sec: Twp: Footage: 1991 FNL  2050 FWL
Proposed Depth/Form:6599 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:12/24/2004
Spud Date:10/15/2004Spud Date Is:ACTUAL
Measured TD:6596 ft.Measured PB depth:6450 ft.
True Vertical TD:6570 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1991 FNL  2050 FWL
Bottom Hole Location:Sec: Twp: Footage: 1991 FNL  2050 FWL
Log Types:RESERVOIR MONITOR TOOL ELITE, C B L
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1106 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1105 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6588 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 2750 ft., Bottom: 6587 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1792 ft.NN
FORT UNION2080 ft.NN
MESAVERDE3475 ft.NN
CAMEO5955 ft.NN
ROLLINS6422 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/25/2005                 Interval Top: 4629 ft.    Interval Bottom: 6227 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.344 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/24/2004
Treatment Summary:4000 GALS 7 1/2% HCL, 428500# 30/50, 10215 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5939 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/25/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 975
CASING_PRESS 523
MCF_GAS 975
TUBING_PRESS 373
Perforation Data:
Interval Top:4629 ft.# Of Holes:82
Interval Bottom:6227 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)15696
GOR826105
GOR DeterminationMCFE
Average BOE per Day7.467
Average MCFE per Day43.325

 Federal Financial Assurance  i Y

 Tribal Well  i No