Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10151
Well Classification: GW Status: PR - 1/1/2021
Well Name/No:FEDERAL #PA 341-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date1/1/2021
FacilityID:272795LocationID:335286
County:GARFIELD #045Location:NENE 20 6S95W 6
Field:PARACHUTE - #67350Elevation:6428 ft.
Basin:PICEANCE BASIN  
Planned Location:1232FNL  857 FELLat/Long: 39.514228 / -108.016184Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.514225 / -108.016105Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2021             Measured TD: 8945 ft.    Vertical TD: 8924 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20051143 Expiration Date:4/28/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1188 FNL  648 FEL
Bottom Hole Location:Sec: Twp: Footage: 1188 FNL  648 FEL
Proposed Depth/Form:9005 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.

Wellbore Completed
Completion Date:8/25/2005
Spud Date:7/12/2005Spud Date Is:ACTUAL
Measured TD:8945 ft.Measured PB depth:8915 ft.
True Vertical TD:8924 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1188 FNL  648 FEL
Bottom Hole Location:Sec: Twp: Footage: 1188 FNL  648 FEL
Log Types:CBL; RESERVOIU MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 916 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 0 ft., Bottom: 916 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8930 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 845, Top: 4075 ft., Bottom: 8929 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3245 ft.NN
FORT UNION3587 ft.NN
MESAVERDE5439 ft.NN
CAMEO8185 ft.NN
ROLLINS8880 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2021                  Interval Top: 6703 ft.    Interval Bottom: 8806 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/25/2005
Treatment Summary:3750 GALS 7 1/2% HCL, 797000# 30/50, 18949 BBLS SLICK WATER (SUMMAR)
Tubing Size:2.375 in.Tubing Setting Depth:8431 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/2/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1210
CASING_PRESS 1686
MCF_GAS 1210
TUBING_PRESS 1544
Perforation Data:
Interval Top:6703 ft.# Of Holes:126
Interval Bottom:8806 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)6560
GOR504615
GOR DeterminationMCFE
Average BOE per Day3.129
Average MCFE per Day18.171

 Federal Financial Assurance  i Y

 Tribal Well  i No