Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10151
Well Classification: GW Status: PR - 1/1/2021
Well Name/No:FEDERAL #PA 341-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date1/1/2021
FacilityID:272795LocationID:335286
County:GARFIELD #045Location:NENE 20 6S95W 6
Field:PARACHUTE - #67350Elevation:6428 ft.
Basin:PICEANCE BASIN  
Planned Location:1232FNL  857 FELLat/Long: 39.514228 / -108.016184Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.514225 / -108.016105Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2021             Measured TD: 8945 ft.    Vertical TD: 8924 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20051143 Expiration Date:4/28/2006
Proposed Top PZ Location:Sec: Twp: Footage: 1188 FNL  648 FEL
Bottom Hole Location:Sec: Twp: Footage: 1188 FNL  648 FEL
Proposed Depth/Form:9005 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: N2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft.

Wellbore Completed
Completion Date:8/25/2005
Spud Date:7/12/2005Spud Date Is:ACTUAL
Measured TD:8945 ft.Measured PB depth:8915 ft.
True Vertical TD:8924 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1188 FNL  648 FEL
Bottom Hole Location:Sec: Twp: Footage: 1188 FNL  648 FEL
Log Types:CBL; RESERVOIU MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 916 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 0 ft., Bottom: 916 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8930 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 845, Top: 4075 ft., Bottom: 8929 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3245 ft.NN
FORT UNION3587 ft.NN
MESAVERDE5439 ft.NN
CAMEO8185 ft.NN
ROLLINS8880 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2021                  Interval Top: 6703 ft.    Interval Bottom: 8806 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/25/2005
Treatment Summary:3750 GALS 7 1/2% HCL, 797000# 30/50, 18949 BBLS SLICK WATER (SUMMAR)
Tubing Size:2.375 in.Tubing Setting Depth:8431 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/2/2005Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1210
CASING_PRESS 1686
MCF_GAS 1210
TUBING_PRESS 1544
Perforation Data:
Interval Top:6703 ft.# Of Holes:126
Interval Bottom:8806 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)6298
GOR484461
GOR DeterminationMCFE
Average BOE per Day3.009
Average MCFE per Day17.460

 Federal Financial Assurance  i Y

 Tribal Well  i No