Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10101
Well Classification: GW Status: PR - 7/27/2005
Well Name/No:PA #422-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/27/2005
FacilityID:272556LocationID:335416
County:GARFIELD #045Location:SENW 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5545 ft.
Basin:PICEANCE BASIN  
Planned Location:2266FNL  1960 FWLLat/Long: 39.496229 / -108.005473Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.496275 / -108.005415Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/27/2005             Measured TD: 7800 ft.    Vertical TD: 7730 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/27/2005
Wellbore PermitDIRECTIONAL
Permit #:20041106 Expiration Date:6/7/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1410 FNL  2020 FWL
Bottom Hole Location:Sec: Twp: Footage: 1410 FNL  2020 FWL
Proposed Depth/Form:7790 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:5/6/2005
Spud Date:3/4/2005Spud Date Is:ACTUAL
Measured TD:7800 ft.Measured PB depth:7770 ft.
True Vertical TD:7730 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1410 FNL  2020 FWL
Bottom Hole Location:Sec: Twp: Footage: 1410 FNL  2020 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2231 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 0 ft., Bottom: 2231 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7789 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 3650 ft., Bottom: 7789 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2017 ft.NN
FORT UNION2391 ft.NN
MESAVERDE4276 ft.NN
CAMEO7027 ft.NN
ROLLINS7691 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/27/2005                 Interval Top: 5491 ft.    Interval Bottom: 7670 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/6/2005
Treatment Summary:2250 GALS 7 1/2% HCL, 905600# 30/50, 18988 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7239 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/9/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1250
CASING_PRESS 1935
MCF_GAS 1250
TUBING_PRESS 1845
Perforation Data:
Interval Top:5491 ft.# Of Holes:115
Interval Bottom:7670 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)9308
GOR775666
GOR DeterminationMCFE
Average BOE per Day4.431
Average MCFE per Day25.701

 Federal Financial Assurance  i 

 Tribal Well  i No